Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM02946
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/19/2014 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 05/19/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Verify the exhaust air flow rate and sequence of operation. The minimum exhaust rate is 50 CFM per water loset or urinal with continuous operation, 70 CFM per water closet or urinal with intermittant operation. 2. Show the size of the proposed dryer vent. 3. Show the specifications for the proposed exhaust fan in the laundry room. |
| 05/19/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | 1) Provide panel schedule A with new loads added. Also specify circuits, loads and wire sizes 2) Provide IECC lighting compliance information for rooms 103, 108, 120. |
| 05/19/2014 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Verify the presence of a backflow preventer at the water meter and the size of the water meter. |
| 05/19/2014 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Completed | |
| 05/19/2014 | LHANLY1 | WWM | REVIEW | Passed | |
| 05/19/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The fixture drain for a clothes washer shall connect to a horizontal drain at least 3" in size. 2. Show the existing DWV piping to clarify how the addition of the urinal is to be accomplished. 3. Provide water hammer arrestors for the clothes washer connections. |
| 05/19/2014 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | |
| 05/19/2014 | LHANLY1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 05/27/2014 | SPOWELL1 | FIRE | REVIEW | Needs Review |