Permit Number: T14CM02869
Parcel: 13815014G

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM02869
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/16/2014 MICHAEL ST. PAUL ZONING REVIEW Passed
05/16/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Specify the required U-factors and Solar Heat Gain Coefficients (SHGC) for the fenestration and doors on the architectural drawings. Clarify which SHGC was used for the windows and provide supporting documentation per footnotes b and c of Section 3: Envelope Assemblies. Reference: Section C103.2, IECC 2012.
2. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012.
3. Correct the ventilation calculations (the room population is 19, not 26) to obtain the minimum required ventilation rate. Reference: Section C403.2.5, IECC 2012.
4. According to the mechanical compliance certificate, the mechanical systems will be required to "meet the commissioning and completion requirements in Section C408.2." If so, provide a copy of the commissioning plan with the next submittal. Reference: Section C408.2.1, IECC 2012.
05/16/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Specify the materials to be used for the extension of the water distribution system in the new addition. Reference: Section 605, IPC 2012.
2. Specify the materials to be used for the new drainage and vent piping and fittings. Reference: Section 702, IPC 2012.
3. The site plan (SP1.0) shows an existing 6" building sewer running below the new addition. Of what material is the existing building sewer constructed? Reference: Section 702.2, IPC 2012.
4. Identify the location of the cleanout for the existing building sewer downstream of its exit from the footprint of the new addition. Verify that the construction of the new classroom addition will not result in cleanout intervals for the existing building sewer being in excess of 100-feet. Reference: Sections 708.3.2 and 708.3.5, IPC 2012.
5. Show how the new building sewer will be connected to the public sewer. Reference: Section 701.2, IPC 2012.
6. Provide the first floor elevation for the building addition. Determine the need for a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson.
7. Coordinate the roof drainage elements as shown on sheets A1.0 and P1.1. Clarify how the roof drain overflow will be handled. Reference: Section 107.2.1, IBC 2012 and Section 1108, IPC 2012.
05/16/2014 MARTIN BROWN FIRE REVIEW Approved Be advised: required annual sprinkler and alarm inspections and required 5 year check valve inspections are past due. These must be current before C of O will be issued by the fire department.
05/16/2014 RONALD BROWN BUILDING-COMMERCIAL REVIEW Reqs Change SHEET A0.0 and A1.0
1. Please show location of new and existing gardrails as shown on sections 1 and 2/A4.0.
2. Please show and define the new wrought iron fence.
a. Show gate on elevations as shown on floor plans.
b. Insure panic hardware on gate.
SHEET A5.0
3. Show signage location on detail 11
SHEET A5.1
4. Update the toilet room signage details and sign specifications to that as required by the 2009 ICC A117.1, Section 703.
GENERAL
5. Certification of special inspectors shows only post tension special inspection when there are others required: expansion anchors, epoxy, foundation excavation and field welding. Please provide additional certifications for these additional inspections. If not required please provide a letter from the structural engineer stating that these are not required.
END OF REVIEW
05/16/2014 ROBERT SHERRY WATER REVIEW Approved
05/20/2014 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Completed
05/22/2014 LOREN MAKUS ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/23/2014 CPIERCE1 REJECT SHELF Completed