Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM02753
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/12/2014 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
05/12/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
05/12/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
05/12/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
05/12/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A1; CEILING PLAN KEYNOTES: NOTE 3 WAS NOT LOCATED ON THE PLAN. VERIFY. 2. SHEET A1; SECTION 7: AT THE STEEL STUD KICKERS ABOVE THE CEILING, PROVIDE THE KICKER SIZE. INDICATE THE CONNECTORS (SIZE AND QUANTITY) FOR THE CONNECTION OF THE KICKER TO THE TOP OF THE PARTITION. ADD TO THE SECTION, INCLUDING THE CONNECTION OF THE KICKER TO THE EXISTING STRUCTURE ABOVE. 3. SHEET AA: REVISE THE SHEET NUMBER TO MATCH THE DRAWING INDEX (AA OR A1?). |
05/12/2014 | LHANLY1 | WWM | REVIEW | Passed | |
05/12/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Sections 416.5 and 607.1, IPC 2012 and Section C404.3, IECC 2012. |
05/12/2014 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | |
05/12/2014 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
05/12/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |