Permit Number: T14CM02729
Parcel: 13707037A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM02729
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/12/2014 STEVE SHIELDS ZONING REVIEW Denied P&DS TRANSMITTAL


FROM: Steve Shields, Lead Planner

PROJECT:
T14CM02729 & DP14-0074
Vida Nueva - Addition
330 W. Nebraska Street

TRANSMITTAL: September 12, 2014


COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1).

A portion of this site is located in the R-2 zone (UDC 4.7.9). Religious Use is a permitted use in this zone (Table 4.8-2).

1. Per UDC TABLE 6.3-2.A: DIMENSIONAL STANDARDS FOR THE R-1, R-2, R-3, MH-1, & MH-2 ZONES, Nonres Use to Res Zone the required perimeter yard setback from the proposed addition, canopy addition, to the west property line is 10' or ¾ the height of the exterior wall, which ever is greatest, measured from grade to the highest point of the wall. That said based on a wall height of 23'-5" the required perimeter yard setback from the porch cover to the west property line is 17'-6", proposed perimeter yard based on a 2'-6" overhang is 4'-0".

2. Per UDC TABLE 6.3-2.A: DIMENSIONAL STANDARDS FOR THE R-1, R-2, R-3, MH-1, & MH-2 ZONES, Nonres Use to Res Zone the required perimeter yard setback from the proposed addition to the west property line is 10' or ¾ the height of the exterior wall, which ever is greatest, measured from grade to the highest point of the wall. That said based on a wall height of 29'-9" the required perimeter yard setback from the entry exterior wall to the west property line is 22'-4", proposed perimeter yard is 20'-0".

The Building plan and development package cannot be approve until the DDO is approved.
09/12/2014 MARTIN BROWN FIRE REVIEW Approved
10/09/2014 AROMERO4 MECHANICAL-COMMERCIAL REVIEW Needs Review
10/09/2014 AROMERO4 ELECTRICAL-COMMERCIAL REVIEW Needs Review
10/09/2014 AROMERO4 WATER REVIEW Needs Review
10/09/2014 RONALD BROWN BUILDING-COMMERCIAL REVIEW Needs Review
10/09/2014 AROMERO4 WWM REVIEW Needs Review
10/09/2014 AROMERO4 PLUMBING-COMMERCIAL REVIEW Needs Review
10/09/2014 LOREN MAKUS ENGINEERING REVIEW Approved
10/09/2014 RONALD BROWN COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed