Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM02634
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/07/2014 | DAVID RIVERA | ZONING | REVIEW | Approved | |
| 05/07/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Correct the ventilation calculations, verify the room areas. 2. The restroom exhaust fans shall run whenever the A/C unit supplies air to the restroom. 3. Show the size, route and termination of the condensate drains. |
| 05/07/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Complete the water pressure calculations. Include the pressure drop due to the RPBP. 2. Clarify the fixture schedule - what fixtures will be remaining. 3. The specified faucet for the lavatories does not regulate the water temperature. Provide a mixing valve for each lavatory that is listed per ASSE 1070. 4. Verify the minimum flow rate required to activate the tankless water heaters. 5. What is the expansion tank for? |
| 05/07/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 05/07/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 05/07/2014 | ELEIBOL1 | ENGINEERING | REVIEW | Approved | |
| 05/07/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 05/07/2014 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 05/08/2014 | CPIERCE1 | WWM | REVIEW | Passed | |
| 05/08/2014 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Completed | Provide 2012 IECC (interior) lighting calculation: use ComCheck report, or Table C405.5.2(1) building area or (2) space-by-space for budget determination. |