Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T14CM02558
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/05/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 06/05/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The scuppers shown on sheet A3.0 are adequate for the primary drainage of the roof. Provide secondary drainage for the roof. [Initial comment: Provide secondary (overflow) roof drainage for the new sun deck and porch roof. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012.] |
| 06/05/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Coordinate the components used for the envelope energy compliance calculations and the design shown on the drawings. The calculations include R-38 in the roof and R-19 in the exterior walls but the drawings call out R-30 and R-11 respectively. The windows are not specified on the drawings. [Initial comment: Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.] |