Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T14CM02468
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/05/2014 | KEN BROUILLETTE | FIRE | REVIEW | Approv-Cond | THIS PROJECT NEEDS TO BE REVIEWED BY THE ARIZONA STATE FIRE MARSHAL'S OFFICE |
| 05/07/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET S1; SOLAR SUPPORT STRUCTURES: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE THE GENERAL STRUCTURAL NOTES. 2. SHEET S1 (SOLAR SUPPORT STRUCTURES); GENERAL STRUCTURAL NOTES (WIND): THE BASIC WIND SPEED IS 90 MPH (3 SECOND GUST) FOR ALLOWABLE STRESS DESIGN (115 MPH ULTIMATE). VERIFY DESIGN MEETS THOSE CRITERIA. 3. SHEET S1 (SOLAR SUPPORT STRUCTURES); GENERAL STRUCTURAL NOTES (FOUNDATIONS): THE FIRST NOTE INDICATES A SOIL REPORT WAS USED. PROVIDE THAT REPORT FOR REVIEW. 4. SHEET S1 (SOLAR AWNING SUPPORT); FRAMING PLAN: THE COLUMN CENTERLINE TO CENTERLINE DIMENSION ON THE FRAMING PLAN (14'-2" + 14'-2" = 28'-4") DOES NOT MATCH THE COLUMN LOCATION MAP ON THIS SHEET. CLARIFY. 5. SHEETS S1 AND S1.1 (SOLAR AWNING SUPPORT); FRAMING PLAN: DOES THE 4X4X1/4 TS STUB COLUMN OCCUR ONLY IN 1 LOCATION ON THE EAST AND WEST WING PLANS? VERIFY. 6. SHEET S2 (SOLAR AWNING SUPPORT); FOUNDATION PLAN: THE STRUCTURAL CALCULATIONS AND THE PIER FOOTING SCHEDULE INDICATE THE COLUMN FOOTING F1 IS 2'-0" SQUARE X 9'-0" DEEP, WHILE THE FOOTING DETAIL ON SHEET S2 INDICATES A 24" DIAMETER CAISSON. CLARIFY. 7. SHEET S2 (SOLAR AWNING SUPPORT); FOUNDATION PLAN: PROVIDE A DETAIL ON THE DRAWINGS INDICATING THE NEW COLUMN FOOTING IN RELATION TO THE EXISTING BUILDING AND IT'S FOUNDATION. DOES THE NEW FOOTING INTERFERE WITH THE EXISTING FOUNDATION, AND IF SO, HOW IS THIS TO BE CONSTRUCTED? 8. GENERAL: REVISE THE SHEET NUMBERING SO THERE ARE NOT DUPLICATES OF THE SAME SHEET NUMBER FOR DIFFERENT PARTS OF THE PROJECT. 9. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 05/14/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/14/2014 | AROMERO4 | APPROVAL SHELF | Completed |
| 05/14/2014 | AROMERO4 | OUT TO CUSTOMER | Completed |
| 05/14/2014 | CPIERCE1 | REJECT SHELF | Completed |