Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T14CM02300
Parcel: 13817047B

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T14CM02300
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/12/2014 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
06/13/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Comment not addressed. [Initial comment: Submit documentation from the Pima County Department of Environmental Quality showing that the proposed gray water collection system has been approved for construction under a General Permit for the collection and use of gray water by a non-residential entity producing in excess of 400 Gallons per day. Reference: Section R18-9-17, Arizona Administrative Code.]
2. Comment not addressed. [Initial comment: Provide roof drainage calculations based on the 100-year hourly rainfall rate for Tucson, 3" per hour. Show the dimensions of the gutters. Reference: Sections 1106.1 and1106.6, IPC 2012.]
06/13/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide the revised COMcheck envelope compliance certificate. [Initial comment: The COMcheck envelope compliance certification calls for the metal building roof to have a double layer of insulation with R-38 in the cavity, R-3.5 thermal blocks, and continuous R-8 insulation. Provide shop drawings to show how this level of insulation is to be accomplished.]
2. Provide the revised COMcheck envelope compliance certificate. [Initial comment: Revise the COMcheck envelope compliance certification to include the exterior doors for the building. Show the door properties (e.g. U-values and, in the case of doors with more than 50% glazing, the SHGF) on the drawings.]

Final Status

Task End Date Reviewer's Name Type of Review Description
06/19/2014 CPIERCE1 REJECT SHELF Completed
06/16/2014 SHANAE POWELL OUT TO CUSTOMER Completed