Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM02195
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/17/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A2.0; SECOND FLOOR STAIR PLAN: THE IBC SECTION 1009.8 REQUIRES DOORS OPENING ONTO A LANDING SHALL NOT REDUCE THE LANDING TO LESS THAN 1/2 THE REQUIRED WIDTH. PER SECTION 1009.4 (EXCEPTION 1), THE REQUIRED WIDTH IS 36". DOES THE DOOR OPENING MEET THE CODE REQUIREMENT? VERIFY. 2. SHEET A2.0; SECOND FLOOR STAIR PLAN: THE IBC SECTION 1009.8 REQUIRES A FULLY OPEN DOOR SHALL NOT PROJECT MORE THAN 7" INTO A LANDING. DOES THE DOOR MEET THE CODE REQUIREMENT? VERIFY. 3. SHEET S1.0; STRUCTURAL NOTES: LIST THE REQUIRED CONCRETE COMPRESSIVE STRENGTH ON THE DRAWINGS. 4. SHEET S1.0; DETAIL 2: PROVIDE THE FOOTING SIZE ON THE DRAWING. 5. GENERAL: PROVIDE A CALCULATION ON THE DRAWINGS INDICATING THE REQUIRED WIDTH OF THE STAIR PER THE IBC SECTION 1005.3.1. 6. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
04/17/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/18/2014 | LEERAY HANLY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
04/18/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Passed | |
04/18/2014 | LHANLY1 | WATER | REVIEW | Passed | |
04/18/2014 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
04/18/2014 | LHANLY1 | WWM | REVIEW | Passed | |
04/18/2014 | LEERAY HANLY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
04/18/2014 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
04/18/2014 | MARTIN BROWN | FIRE | REVIEW | Approved |