Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T14CM01932
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/09/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/09/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Plumbing sheets show an additional tankless water heater in added restroom while the electrical plans do not. Coordinate plans, and if necessary add additional loads into panel A1. |
05/12/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Previous comments not addressed: 1. Correct the calculations in the fixture connection schedule and the pressure loss calculations. 2. Verify that the water demand can be accommodated by the existing water meter. 3. Show that the minimum plumbing fixtures have been provided (e.g. drinking fountain). 4. Verify with the manufacturer that the specified water heaters can successfully supply hot water to the lavatories. 5. Provide power for the second water heater. |
05/12/2014 | SPOWELL1 | FIRE | REVIEW | Needs Review | |
05/12/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Previous comment not addressed: Show that the building addition complies to the requirements of the 2012 IECC. |
05/12/2014 | SPOWELL1 | ZONING | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/12/2014 | SHANAE POWELL | APPROVAL SHELF | Completed |
05/12/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |