Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM01932
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/07/2014 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
04/07/2014 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
04/07/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A1.0: PROVIDE AN ENLARGED PLAN OF THE NEW RESTROOM. THE RESTROOM MUST MEET ALL ACCESSIBILITY ISSUES, INCLUDING SPACE REQUIREMENTS, GRAB BARS, ETC. 2. GENERAL: PROVIDE WRITTEN RESPONSE TO THE REVIEW COMMENT. |
04/07/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/08/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The building shell being modified in this activity does not appear to have been conditioned. Section C101.4.5, IECC 2012 requires the space to be brought into full compliance with the current energy code. Provide energy code compliance calculations for the building envelope, the mechanical system, and the internal lighting. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012. 2. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. |
04/08/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | |
04/08/2014 | ROBERT SHERRY | WATER | REVIEW | Denied | Verify that backflow protection has been provided at the water meter. |
04/08/2014 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
04/08/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2012. |
04/15/2014 | FRODRIG2 | WWM | REVIEW | Passed |