Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T14CM01931
Parcel: 118262100

Address:
701 E 36TH ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM01931
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/07/2014 STEVE SHIELDS ZONING REVIEW Approved
04/07/2014 JASON GREEN ENGINEERING REVIEW Approved
04/07/2014 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET A1.0; FLOOR PLAN: REVIEW THE IBC SECTION 1008.1.4.3 FOR THE REQUIREMENTS OF SLIDING DOORS USED AS A COMPONENT OF A MEANS OF EGRESS. SINCE THE OCCUPANT LOAD FOR THIS BUILDING IS 13, ONLY ONE EXIT IS REQUIRED. REMOVE THE EXIT DESIGNATION AT A SLIDING DOOR, OR MEET THE CRITERIA INDICATED ABOVE, OR PROVIDE AN EXIT DOOR (OR USE THE EXISTING MAN DOOR).
2. SHEET A1.0; FLOOR PLAN: THE EXISTING DOOR AND FRAME (NOTE 17) IS BEING REMOVED AND FILLED IN SO IT IS NO LONGER AN EXIT. REFER TO NOTE 1.
3. SHEET A4.0; PARTITION DETAIL: BRACE THE TOP OF THE PARTITION WALL SO THAT IT MEETS THE LATERAL CRITERIA OF THE IBC SECTION 1607.14. PROVIDE THE BRACE SIZE, SPACING, AND CONNECTION (SIZE AND QUANTITY) TO THE TOP OF THE WALL AND TO THE STRUCTURE ABOVE.
4. SHEET S1.0; ROOF FRAMING PLAN: INDICATE THE ROOF TRUSSES ARE EXISTING.
5. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
04/07/2014 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
04/08/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. The building shell being modified in this activity does not appear to have been conditioned. Section C101.4.5, IECC 2012 requires the space to be brought into full compliance with the current energy code. Provide energy code compliance calculations for the building envelope, the mechanical system, and the internal lighting. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012.
2. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012.
04/08/2014 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Reqs Change FILL OUT IECC COMPLIANCE CERTIFICATES IN A MANNER THAT ONLY INDICATES WHAT YOU ARE ACTUALLY DOING. (I DO NOT SEE ANY SLEEPING UNITS IN THESE PLANS
04/08/2014 ROBERT SHERRY WATER REVIEW Denied Verify that backflow protection has been provided at the water meter.
04/08/2014 KEN BROUILLETTE FIRE REVIEW Approved
04/08/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
04/15/2014 FRODRIG2 WWM REVIEW Passed