Permit Number: T14CM01874
Parcel: 140420760

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM01874
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/07/2014 DAVID RIVERA ZONING REVIEW Approved
04/09/2014 MARTIN BROWN FIRE REVIEW Approved
04/09/2014 RONALD BROWN BUILDING-COMMERCIAL REVIEW Reqs Change GENERAL
1. Need to provide structural calculations and structural detail for the wall mounted water heater. Please include existing partition analysis.
2. Please provide two sets of structural calculations.
3. Provide a site plan showing all ramps and all site changes.
SHEET A0.0
4. As noted on the Code Data Summary, two occupancy loads are not code compliant. The acceptable occupancy load is the one calculated from table 1104.1.2 at 1/100 gross for bussiness occupancies. Please revise your exiting floor plan for this calculated number.
SHEET A6.0
5. At detail 1:
a. Something does not look correct about the handrail configuration at the building entrance landing. Please look this over and make revisions as required.
b. Please provide elevations of the ramp handrails.
c. Please provide handrails on both side of the stairs.
d. Provide ramp run dimensions and landings dimensions
END OF REVIEW
04/10/2014 ROBERT SHERRY WATER REVIEW Approved
04/10/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide structural calculations and details to show how the proposed water heater is to be supported from the building structure. Reference: Section 301.2, IPC 2012.
2. Provide the minimum plumbing facilities (e.g. drinking fountain) required by Table 2902.1 and Section 2902.2, IBC 2012, for business occupancy. Reference: Section 410.2, IPC 2012.
3. Provide tempered water for the lavatories using approved devices conforming to ASSE 1070 (i.e. not just "ASSE certified"). Reference: Sections 416.5 and 607.1.2, IPC 2012.
4. Verify that the existing 3" branch of the building drain serving the restroom can accommodate the additional drainage fixture units based on the proposed plumbing plan (47 DFU at a ΒΌ" slope) Reference: Section 710.1, IPC 2012.
5. Clarify which hot water recirculation pump is to be installed and state the recirculation flow rate, Reference: Section 107.2.1, IBC 2012.
04/14/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. What is a "Humidizer Adaptive Dehumidification System" (see Note 14, Air Conditioning Unit Schedule)?
2. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012.
3. Clarify the outside air requirements for room 104 (IDF) served by AC-1. The schedule calls for the unit to have an outside air intake hood with a 2-position damper interlocked with the fan motor but no outside air. Reference: Section 403.3, IMC 2012.
04/14/2014 KEN VAN KARSEN ELECTRICAL-COMMERCIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
04/21/2014 CPIERCE1 REJECT SHELF Completed
04/15/2014 AROMERO4 OUT TO CUSTOMER Completed