Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM01874
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/07/2014 | DAVID RIVERA | ZONING | REVIEW | Approved | |
| 04/09/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 04/09/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | GENERAL 1. Need to provide structural calculations and structural detail for the wall mounted water heater. Please include existing partition analysis. 2. Please provide two sets of structural calculations. 3. Provide a site plan showing all ramps and all site changes. SHEET A0.0 4. As noted on the Code Data Summary, two occupancy loads are not code compliant. The acceptable occupancy load is the one calculated from table 1104.1.2 at 1/100 gross for bussiness occupancies. Please revise your exiting floor plan for this calculated number. SHEET A6.0 5. At detail 1: a. Something does not look correct about the handrail configuration at the building entrance landing. Please look this over and make revisions as required. b. Please provide elevations of the ramp handrails. c. Please provide handrails on both side of the stairs. d. Provide ramp run dimensions and landings dimensions END OF REVIEW |
| 04/10/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 04/10/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide structural calculations and details to show how the proposed water heater is to be supported from the building structure. Reference: Section 301.2, IPC 2012. 2. Provide the minimum plumbing facilities (e.g. drinking fountain) required by Table 2902.1 and Section 2902.2, IBC 2012, for business occupancy. Reference: Section 410.2, IPC 2012. 3. Provide tempered water for the lavatories using approved devices conforming to ASSE 1070 (i.e. not just "ASSE certified"). Reference: Sections 416.5 and 607.1.2, IPC 2012. 4. Verify that the existing 3" branch of the building drain serving the restroom can accommodate the additional drainage fixture units based on the proposed plumbing plan (47 DFU at a ΒΌ" slope) Reference: Section 710.1, IPC 2012. 5. Clarify which hot water recirculation pump is to be installed and state the recirculation flow rate, Reference: Section 107.2.1, IBC 2012. |
| 04/14/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. What is a "Humidizer Adaptive Dehumidification System" (see Note 14, Air Conditioning Unit Schedule)? 2. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 3. Clarify the outside air requirements for room 104 (IDF) served by AC-1. The schedule calls for the unit to have an outside air intake hood with a 2-position damper interlocked with the fan motor but no outside air. Reference: Section 403.3, IMC 2012. |
| 04/14/2014 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/21/2014 | CPIERCE1 | REJECT SHELF | Completed |
| 04/15/2014 | AROMERO4 | OUT TO CUSTOMER | Completed |