Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T14CM01871
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/09/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/12/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/15/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | The heating and cooling loads do not include any accounting for heat pump RTU-2. [Initial comment: Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012.] |
05/15/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a cleanout for the 3" horizontal branch (between the two floor sinks and the building drain). Reference: Section 708.3.1, IPC 2012. [Initial comment: Provide waste and vent isometrics. Reference: Section 107.2.1, IBC 2012.] 2. The addition of the hydromechanical grease interceptor for the 3-compartment sink appears to have the 3-compartment sink directly-connected to the grease interceptor and the grease interceptor indirectly-connected to the sanitary drain system. In addition, the existing floor sink appears to be hidden by the new grease interceptor. The 3-compartment sink shall discharge indirectly using an air gap and the grease interceptor shall be directly-connected to the sanitary drain system. A downstream vent is required for the grease interceptor. Provide ready access to the floor sink. Clarify the installation of the grease interceptor. (Note that keynote #10 on sheet P-301 indicates that no plumbing work is to occur at the location of the 3-compartment sink.) Reference: Sections 802.1, 802.1.8, 802.3, and 1003.9, IPC 2012. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/27/2014 | AROMERO4 | APPROVAL SHELF | Completed |
05/27/2014 | AROMERO4 | OUT TO CUSTOMER | Completed |
05/27/2014 | CPIERCE1 | REJECT SHELF | Completed |