Permit Number: T14CM01869
Parcel: 113103640

Address:
1330 E WATER ST

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T14CM01869
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/13/2015 ELEIBOL1 ENGINEERING REVIEW Needs Review Tucson Code Sec.26-11.2(h): Due to additional information (regarding unpermitted addition), the PASS for the shed is now changed to Needs Review for Floodplain Use Permit compliance for the additon that is now disclosed. Non-substantial imrpovement paperwork and Floodplain Use Permit application is now required, with copy of documentation of the value of the addition (labor & materials). Call to discuss or if there are questions, Elizabeth Leibold P.E., CPM, CFM PDSD Engineering City of Tucson (520)837-4934
01/16/2015 DAVID RIVERA ZONING REVIEW Denied P&DS TRANSMITTAL


FROM: David Rivera, Principal Planner

Project: T14CM01869

TRANSMITTAL: March 13, 2013

COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1).


This site is located in the R-1 zone (UDC 4.7.8). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.5 - 9.

The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure's wall facing each interior property line (Table 6.3-2.A).

Applicant is requesting approval of an existing structure that was built without permits. The structure is a lattice porch and is attached to the dwelling. The Lattice Porch does not meet the minimum building setback of 6 feet from the east side yard. A DDO approval is required for a 3'-6" building setback from the east side yard.

***If the Lattice Structure is not attached to the dwelling, the applicant may request a setback waiver from the adjacent property "OWNER" that is affected by the reduced building setback. (It must be the owner of the property that approves the setback waiver.)