Permit Number: T14CM01254
Parcel: 140418670

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T14CM01254
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/07/2014 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: FedEx Ground Co-Location - 7050 S. Palo Verde Road - Foundation Onle
T14CM01254
Building Plan (1st Review)

TRANSMITTAL DATE: March 7, 2014

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning has reviewed the building plans for compliance with the development package but until the development package has been approved zoning cannot approve the building plan.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
03/10/2014 JASON GREEN ENGINEERING REVIEW Reqs Change DATE: March 10, 2014
REVIEWER: Jason Green, CFM
ACTIVITY: T14CM01254 (Building Plan)

SUMMARY: Engineering Division of Planning & Development Services Department has received the building plan (T14CM01254). Engineering Division does not recommend approval of the building plan applications at this time. The following items need to be addressed:


BUILDING PLAN COMMENTS:

1) Engineering could not verify that the building plan was in compliance with the stamped approved Development Plan Package (DP14-0030). Please submit a copy of the stamped approved Development Plan Package with the next building plan submittal.

2) Engineering will re-review the building plan on the next submittal to insure compliance with the approved and stamped Development Plan Package. Additional comments may be forthcoming.


GENERAL COMMENTS:

Please provide the building plan with a copy of the last approved Development Plan Package (DP14-0030). Further comments may be generated upon resubmittal of the building plan review.

For questions or to schedule an appointment I can be reached at 837-4929.




Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services
03/12/2014 MARTIN BROWN FIRE REVIEW Approved Be advised, if the building contains high pilied storage as defined by the 2012 International Fire Code (and the height of the proposed building indicates it might), the requirements of chapter 32 of the IFC may come into play. These include fire department access, access doors every 100 lineal feet, etc.
03/14/2014 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEETS S1.1 AND S1.2; FOUNDATION PLANS: ARE THERE FOUNDATIONS AT THE STAIRS THAT NEED TO BE INCLUDED WITH THIS PERMIT? VERIFY.
2. SHEET S2.1; SLAB PLAN: AT THE EAST EXTERIOR WALL, TWO PLAN NOTES REFERENCE DETAIL 8/S4.1 FOR BOLLARD DETAILS. REVISE THE DETAIL REFERENCE.
3. SHEET S.2.2; SLAB PLAN: AT THE NORTH EXTERIOR WALL, TWO PLAN NOTES REFERENCE DETAIL 8/S4.1 FOR BOLLARD DETAILS. REVISE THE DETAIL REFERENCE.
4. SHEET S3.1; DETAIL 306: PROVIDE A DETAIL TITLE.
5. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
03/24/2014 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Completed
03/24/2014 LEERAY HANLY PLUMBING-COMMERCIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
04/04/2014 CPIERCE1 OUT TO CUSTOMER Completed