| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/10/2014 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 03/10/2014 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 03/12/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/13/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | GENERAL 1. Provide the 2 part certification form for special inspectors required. 2. Provide structural calculations for all new roof mounted HVAC equipment. 3. Where are sheets A1.1, A1.2, A1.3 AND A1.4? 4. Please provide an accurate Site Plan. STRUCTURAL CALCULATIONS 5. Provide a structural framing and a structural foundation key plan. SHEET G1.1 6. Applicable Codes a. Correct 2012 NEC to 2011 NEC b. Corerct NFPA to 2012 NFPA c. Correct 2003 ICC A117.1 to 2009 ICC A117.1 SHEET A2.1 7. Show accessible seating required. END OF REVIEW |
| 03/14/2014 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 03/25/2014 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
| 03/31/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide energy code compliance calculations for the additions to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012. 2. Thermostats that are new or are being relocated shall comply with the capabilities required by Section C403.2.4, IECC 2012. 3. Provide heating and cooling load calculations that justify the capacities of the new rooftop unit specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. |
| 03/31/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a complete diagram of the natural gas distribution system showing the all of the loads and the developed lengths of the distribution piping. Reference: Section 107.2.1, IBC 2012. 2. Provide tempered water for lavatories located in restrooms using approved devices conforming to ASSE 1070. The Watts model USG-B mixing valve is listed to ASSE Standard 1070 for single fixture applications, not ASSE 1016 as noted in the plumbing fixture specifications. Reference: Sections 416.5 and 607.1.2, IPC 2012. 3. A dishwasher may not discharge through a hydromechanical grease interceptor but it is required to discharge through a gravity grease interceptor. Reference: Section 1003.3, IPC 2012, as amended by the City of Tucson. 4. Provide secondary (overflow) roof drainage. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012. 5. Provide calculations to show that the size of the overflow in the roof drain collector box has a drainage capacity equal to that of the scupper. Reference: Sections 1108.1 and 1108.3, IPC 2012. |
| 03/31/2014 | ROBERT SHERRY | WATER | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/01/2014 | FERNE RODRIGUEZ | REJECT SHELF | Completed |