Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/24/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | GENERAL 1. There are three different special inspection schedules, one on sheet S1.0, one on sheet S5.3 and one on sheet S1.10 all listing different special inspections. Please coordinate one list of special inspections and provide one certification for the special inspectors selected. 2. Provide a site plan. SHEET a1.1 3. Show a 5' clear turn around in the laundry room. 4. Both toilet rooms are non compliant with the 2009 ICC A117.1, Section 304.3.1; 5'-0" clearance turnaround is not provided. SHEET A2.2 5. Provide accessible toilet signage. 6. At detail B4, sink counter top height is to be 2'-10" not 3'-0". SHEET S2.00 7. The footing schedule calls for 4 #4s continous while the calculations calls for #5 @ 12" O.C. Please reconcile. 8. Specify ledger size at bearing stud-wall (detail C1 and A4 are not coordinated) 9. Specify hangers & web-stiffeners for TJI's as per Weyerhouser/Forte sheet 7 in Structural calculations. 10. Delete conflicting "typical" details such as sections D4 & D5 11. GSN 7 pp S1.0 calls for doubling of joists at mechanical units. Is this your intent? 12. Specify top of wall condition for masonry wall. 13. Specify vertical reinforcement of masonry wall conforming to pp 11 of structural calculations END OF REVIEW |
02/25/2014 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The Development Package must be approved first. |
02/25/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Clarify if splash pad equipement is going to be fed from clubhouse service or if new service will be part of future permit. Clarify if circuits 12,14 in clubhouse service panel are to feed outdoor lighting indicated on subsequent plan sheets. |
02/26/2014 | LEERAY HANLY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide site plan with location & sizing of sewers, water lines, water meters and backflow preventors. (IBC107 / IPC106.3.1) Also clarify use of 2 1/2" meter mentioned in water calculations. 2. Provide finished floor elevation and invert of nearest upstream manhole. (IPC 106.3.1) 3. Inlet size for floor drains (fixture P6) in public laundries are required to be 3" minimum. (IPC 412.4) 3(a) Vent for fixture P6 is not allowed in the IPC (IPC 905.5). 4. Include laundry in plumbing fixture schedule. (IPC 106.3.1) 5. Caution: Stack diagram for P1 fixtures may not work in the space allowed. You will need 18" minimum between the outlet of the water closet and a back to back sanitary tee. (IPC 706.3) 6. Clarify HW sizing at riser diagram. It is alternately shown as 3/4" and 1" to sinks and lavs. 7. Show how you are providing sufficient overflow protection from downspout collector at roof scuppers. |
02/26/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/26/2014 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Rio Viejo Apartments - Club House T14CM01014 Building Plan (1st Review) TRANSMITTAL DATE: February 26, 2014 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning has reviewed the building plans but cannot approve until the development package has been approved. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
02/26/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The cut sheets for the three heat pumps are not legible; provide the applicable data in a legible format. Reference: Section 107.2.1, IBC 2012. 2. Demonstrate energy code compliance for the building envelope. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the fenestration components and the Solar Heat Gain Factors for the glazing. Reference: Sections C101.3, C101.5, and C103.2, International Energy Conservation Code 2012. 3. Show that the proposed HVAC systems meet the requirements of Sections C403.2, C403.3 and, if neither the efficient lighting system nor the on-site renewable energy options are selected, C406.2, IECC 2012 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. 4. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 5. Provide an economizer for the inside HVAC unit MS-2 along with means for relieving the excess air during economizer operation or increase the efficiency of the inside HVAC unit per Table C403.3.1(2), IECC 2012. Reference: Section C403.3.1, IECC 2012. See also footnote a, Table C403.3.1 (1), IECC 2012. 6. Show how outside air will be introduced into the inside HVAC units and provide the manufacturer's equipment data and installation instructions that support the proposed method of introducing outside air into the inside HVAC units. Reference: Sections 301 and 304.1, IMC 2012. 7. Show the size, routing, and termination of the condensate drain from the MS-3 inside HVAC unit. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson. 8. Show how the secondary drain systems are to be installed for inside HVAC units MS-1 and MS-2. Reference: Section 307.2.3 IMC 2012. 9. Revise the ventilation calculations using appropriate occupancy types (e.g. "coin-op laundry" instead of corridors and utilities; "conference room" instead of office, "hotel, multi-purpose" instead of lecture classroom, etc.). Do not truncate "fractional people" in the calculations, use equation 4-1 (Section 403.3.1.1, IMC 2012) to determine the breathing zone outdoor air flow, and follow the instructions in Sections 403.3.2.3 through 403.3.2.3.4, IMC 2012 for determining the ventilation for HVAC system MS-1. Reference: Section 403.2, IMC 2012. 10. Provide information to show that the terminations of the dryer exhaust vents comply with the requirements of Section 501.3.1 (3), IMC 2012. 11. Provide documentation to show that the design of the combined dryer ducts complies with the requirements of Section 504.7, IMC 2012. |
02/26/2014 | LHANLY1 | WATER | REVIEW | Reqs Change | 1. Clarify water demand and meter sizing. Include laundry facilities in demand. |
02/26/2014 | LHANLY1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/27/2014 | CPIERCE1 | OUT TO CUSTOMER | Completed |