Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T14CM00977
Parcel: 10408090D

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM00977
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/19/2014 STEVE SHIELDS ZONING REVIEW Approved
02/19/2014 JASON GREEN ENGINEERING REVIEW Approved
02/20/2014 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Completed
02/20/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Verify that the proposed Type I hood is equipped to automatically start the hood exhaust fan when cooking operations commence. Reference: Section 507.2.1.1, IMC 2012.
02/20/2014 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Completed
02/20/2014 ROBERT SHERRY WATER REVIEW Approved
02/20/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The capacity of the specified grease separator is less than the required minimum capacity. In addition, the Rockford G-series separators are designed for on the floor or partially recessed installation. Reference: Sections 303.2 and 1003.3, IPC 2012, as amended by the City of Tucson.
2. Provide separate indirect waste pipes for each compartment of the 3-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012.
3. Indirect waste receptors shall be not be installed in inaccessible or unventilated spaces (e.g. cupboards, storerooms, or closets). Indirect waste receptors shall have ready access. Reference: Section 802.3, IPC 2012.
02/20/2014 MARTIN BROWN FIRE REVIEW Denied Type 1 hood specified on sheet M-3 requires a kitchen exhaust hood fire suppression system. Please add this to list of deferred submittals.
Hood suppression system must be tied into sprinkler monitoring. Please add fire alarm to list of deferred submittals.
02/20/2014 LHANLY1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
02/26/2014 CPIERCE1 WWM REVIEW Completed