Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM00816
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/13/2014 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
| 02/18/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | SHEET A7.0 1. Please identify the accessible urinal as per the plumbing drawings. a. Once identified, please provide a 3'-0" wide urnial stall as required by ICC A117.1, Section 605 and 305. GENERAL 2. Provide a structural analysis of all newly installed roof top mounted HVAC equipment. 3. Provide certification of all required special inspectors. END OF REVIEW |
| 02/26/2014 | CPIERCE1 | WWM | REVIEW | Completed | |
| 02/26/2014 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
| 02/26/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 02/27/2014 | KEN VAN KARSEN | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a complete diagram of the natural gas distribution system showing the all of the loads, developed lengths, and the layout of the distribution piping. The note on sheet P1.2 states that the new gas load is 1834 CFH with an existing load of 1704 CFH; with the exception of 72 CFH being supplied to the relocated 3-ton unit, none of the other loads are shown. Reference: Section 107.2.1, IBC 2012. 2. Provide tempered water for the lavatories using approved devices conforming to ASSE Standard 1070. The temperature mixing valve shown in detail 1/P3.0 is ASSE Standard 1017 listed and, per the manufacturer, "[t]hey cannot be used by themselves for tempering water temperatures at fixtures where ASSE Standard 1016 or ASSE Standard 1070, listed devices are required." Reference: Sections 303.2, 416.5, and 607.1, IPC 2012. 3. The developed length of the hot water supply piping (from WH-3 to P6 in room 108) appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2012. |
| 02/27/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 2. Provide calculations demonstrating adequate ventilation using the current code and use appropriate occupancy categories (e.g. use "telephone/data entry" for the open office area). Reference: Section 403.2, IMC 2012. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/04/2014 | CPIERCE1 | OUT TO CUSTOMER | Completed |
| 03/04/2014 | CPIERCE1 | REJECT SHELF | Completed |