Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM00736
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/06/2014 | DAVID RIVERA | ZONING | REVIEW | Approved | |
02/06/2014 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
02/06/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET TS1; APPLICABLE CODES: CHANGE THE ACCESSIBILITY CODE TO THE 2009 ICC/ANSI A117.1. 2. SHEET A1.0; FLOOR PLAN: REMOVE THE EXIT SIGN DESIGNATION AT THE STOCK ROOM. 3. SHEET A1.1; ELEVATION A: LOCATE THE VERTICAL GRAB BAR FROM THE BACK WALL. |
02/06/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
02/07/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 2. Show that the proposed replacement rooftop units meet the requirements of Sections C403.2.2, C403.2.3, C403.2, and C403.3 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. 3. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Reference: Section 302.1, IMC 2012. 4. Provide calculations demonstrating adequate ventilation using the current code. Reference: Section 403.2, IMC 2012. |
02/07/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
02/07/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
02/07/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/07/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Clarify the scope of work for this activity. A note on the drawing states that the "plumbing piping is shown for reference and bidding purposes only. This project is for a shell building only." Is any plumbing work being done as part of this activity? |
02/10/2014 | SPOWELL1 | WWM | REVIEW | Needs Review |