Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T14CM00575
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/05/2014 | MARTIN BROWN | FIRE | REVIEW | Denied | Code analysis information on cover sheet incorrect. A restaurant is an "A-2" occupancy, not mercantile. Occupant load 100 or greater for an A-2 occupancy requires fire sprinklers. Sprinklers will be monitored. Sprinklers and monitoring are separate, deferred submittals. Please include this information on code analysis section. |
02/06/2014 | DAVID RIVERA | ZONING | REVIEW | Approved | |
02/11/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | SHEET T1.1 1. Correct the electrical code to the 2011 NATIONAL ELECTRICAL CODE. 2. At the Occupancy Classification add to RESTAURANT, the 2012 IBC Occupancy Classification of "A2". 3. Change "MERCHANTILE" to "RESTAURANT A2". 4. Reevaluate your assembly load of 10 for ASSEMBLY W/O FIXED both Indoor and outdoor. There is no such allocation. Please reference Table 1004.1.2 for assembly load allowances. 5. Recalculate your total occupancy load as per Table 1104.2.1. END OF REVIEW |
02/18/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Coordinate the plumbing plan and the civil grading & paving plan with respect to the first floor elevation, the rim elevation of the next upstream sewer cleanout, and the inverts of the cleanouts for the grease waste and the building drain. 2. Provide hydraulic calculations to justify the size of the roof scupper. Show how overflow protection is being provided. Clarify the design of the collector box shown in detail 5.A3.1. Reference: Sections 1106 and 1108.3, IPC 2012. |
02/18/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Complete the Mechanical Compliance Certificate by checking the appropriate line items in Section 4, the Requirements Checklist. |
02/18/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
02/26/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/09/2014 | CPIERCE1 | REJECT SHELF | Completed |