Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM00541
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/31/2014 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
02/03/2014 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
02/05/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/06/2014 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | SHEET G1.2 1. The occupancy calculations are not consistent with Sheet G1.5. Please reconcile. SHEET G1.5 2. Sixty Seven percent of the calculated men's water closet may be urinals as per the 2012 IPC, Section 419.2. Therefore, of the 55 w.c. fixtures required, 37 may be urinals plus 18 water closets. In reference to those provided of 53 urinals plus 38 water closets there are 10 more men's water closets than required. Please include this analysis in your calculations. SHEET A2.3 3. Show speaker and stage light cluster on the reflective ceiling plan and reference to all required structural drawings and details plus the AV drawings. a. Provide all complete structural drawings, details and calculations for this AV/Lighting unit. SHEET A3.1 4. At details 2 and 5: The urinal identified as accessible is in fact not compliant as required by the 2010 ADASAD, Sections 305.7 and 605.3. a. Either provide a 3'-0" wide urinal stall or relocate the accessible urinal to one of the other stalls with a 30" width between two screens 2'-0" deep or less. b.Note 15.6 does not apply to the accessible urinal elevation. SHEET A3.2 5. At detail 2: One urinal must be accessible. Please identify the accessible urinal, provide an interior elevation of the chosen candidate and show all accessible requirements. SHEET A3.3 6. At detail 1: a. One urinal must be accessible. Please identify the accessible urinal, provide an interior elevation of the chosen candidate and show all accessible requirements. b. Also, provide one accessible men's toilet stall. SHEET A3.5 7. At detail 1: Verify the width of the urinal stall in line with the water closets. If it is in fact 3'-0" or more wide then identify this one as the accessible urinal and provide all accessible requirements such as dimensions and interior elevations. SHEET 3.6 8. At detail 2: One urinal must be accessible. Please identify the accessible urinal, provide an interior elevation of the chosen candidate and show all accessible requirements. SHEET A3.9 9. Provide complete structural drawings, details and calculations for the half house curtain system. The reference AV drawings show hardly anything construction wise. SHEET A4.1 10. Provide complete structural drawings, details and calculations for details 4, 5 and 6, Arena Entry Soffit. 11. Provide complete structural drawings, details and calculations for the pendant mounted lighting fixtures. SHEET AV1.0 12. Provide all complete structural drawings, details and calculations for this AV/Lighting unit. END OF REVIEW |
02/18/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
02/18/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. |
02/18/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
02/20/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved |