Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T14CM00187
Parcel: 113061280

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM00187
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/28/2014 KEN BROUILLETTE FIRE REVIEW Approv-Cond THIS IS A CHARTER SCHOOL AND THE ARIZONA STATE FIRE MARSHAL IS THE AHJ. PLANS SHALL BE SUBMITTED TO THE STATE FIRE MARSHAL FOR REVIEW AND APPROVAL.
01/30/2014 RONALD BROWN BUILDING-COMMERCIAL REVIEW Reqs Change SHEET A1.0
1. As per the code analysis. two water dispensers are required. There is only one shown on the plan. Please provide another water cooler and reference the proper mounting height for children as per code.
2. Doors 3 and 9 do not meet the clearance requirements as per 2009 ICC A 117.1, Section 404.2.3.2.
SHEET A3.0
3. Provide structural calculations for all new roof top mounted HVAC equipment.
SHEET A6.0 AND A6.1
4. At Detail 11 and all related Interior Elevations:
a. Correct the grab bar dimensions shown on your figure 604.5.1 to those as required by ICC A117.1, Section 609.4.2.
b. Correct the toilet paper dimensions to that as required by ICC A117.1, Section 604.11.7.
c. Correct the water dispenser spout mounting height to that as required by ICC A117.1, Section 602.2, Exception 2.
d. Correct the lavatory heights to that as required by ICC A117.1, Section 606, Exceptions three and four.
SHEET A7.0
5. Delete all reference to ADA and substitute "Accessible" in it's place.
6. Chage note 1 to read "compliance with the 2012 IBC Chapter 11 and the 2009 ICC A117.1."
STRUCTURAL DRAWINGS AND CALCULATIONS
7. At building "A", there are no calculations for B6 and B8.
8. B7 is claculated to be a 5/18 x 10 1/2 GLB while the drawing schedule indicates it to be a 5 1/8 x 18" GLB.
9. What size is B5A?
10. There are no calculations for F2.
11. There is no foundation key plan for building "A" in the calculations.
END OF REVIEW
01/30/2014 ROBERT SHERRY WATER REVIEW Denied Clarify the water service to building B (Suite 121). The civil plan shows a 1" water meter serving the building with a 2" water service line but the water calculations on sheet P2.0 implies that both building A and building B are jointly served by an existing 2" water meter. Building B appears to have a demand of approximately 23 GPM.
02/03/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Demonstrate energy code compliance for the new doors and windows being added to the building based on the current code. Reference: Sections C101.4.3, C101.5, C103.2, Table C402.2, and Table C402.3, International Energy Conservation Code 2012.
2. Provide cooling load calculations that justify the capacity of the split system specified for the teachers' lounge (room 21). Reference: Sections C403.2.1 and C403.2.2, IECC 2012.
3. Show the location of the thermostats for FC-B1, AC-B1 and AC-B2. Thermostats that are new or are being relocated shall comply with the capabilities required by Section C403.2.4, IECC 2012.
4. Show the size, routing, and termination of the condensate drain for FC-B1 (not shown on the plumbing drawings). Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson.
5. Provide the source of the occupant density, the outside air flow rate per person, and the outdoor air flow rate per square foot used to calculate the ventilation for the teachers' lounge (room 21). Reference: Section 403.3, IMC 2012.
6. Clarify the design and the basis for the design of the combustion and relief duct for the storage room (room 20). Specifically, show the BTUH input in the room, the duct size(s) and termination(s). Reference: Section 304.6, IFGC 2012.
02/04/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the site drawing to show the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2012.
2. Clarify the size of the two existing building drains and building sewers; on plan 2/P1.0 they are 3" but keynote #6 calls them 4" in size. Reference: Section 107.2.1, IBC 2012.
3. Show how the flow rate of the hot water recirculation system was determined. Reference: Section 607.2, IPC 2012.
4. Provide a detail of the modifications to the existing water heater, including the expansion tank, relief valve, recirculation pump, and valves. Reference: Sections 502.1, 503.1, 503.2, 504, 606.1, 607.2, and 607.3 IPC 2012.
5. Provide a cleanout at the junctions of the building drains and the building sewers. If any cleanouts exist at the junctions of the building drains and the building sewers ensure that the cleanouts are brought to grade. Reference: Section 708.3.5, IPC 2012.
6. Provide the rim elevation of the next upstream sanitary manhole and the first floor elevation. Determine the need for a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson.
02/11/2014 KEN VAN KARSEN ELECTRICAL-COMMERCIAL REVIEW Reqs Change T14CM00187 & T14CM00188

1. Provide a circuit for electrical water heaters shown on sheet #P1.1.
2. Provide circuits for the exhaust fans.
3. Show circuit for building A, panel A-29/31 as new.
4. Show a device and circuit for building A, panel B-17 on the plan, or update the description.
5. Show a device and circuit for building A, panel B-30 on the plan, or update the description.
6. Provide a panel schedule description for building B, panel A-19 or re-label the device circuit on the plan.
7. Show a device and circuit for building B, panel A-23 on the plan, or update the description.

Ken Van Karsen
Elect Plan Review
PDSD, City of Tucson
520-837-4912
Kenneth.VanKarsen@tucsonaz.gov
02/14/2014 LOREN MAKUS ENGINEERING REVIEW Approved