Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM00148
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/09/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
01/14/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
01/14/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
01/14/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Coordinate the mechanical and electrical plans. The electrical plans show one split system serving the storage room compared to the two systems shown on the mechanical plans. 2. Verify that the two outside air intakes are positioned on an exterior wall and that the openings comply with the requirements of Section 401.4, IMC 2012. 3. Provide cooling load calculations that justify the capacities of the cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 4. The ventilation calculations indicate that the minimum flow rate for outside air is 78 CFM but the design flow rate for outside air is 105 CFM. Show how the HVAC controls are capable of reducing the outside air to the minimum flow rates required by Chapter 4, IMC 2012. Reference: Section C403.2.5, IECC 2012. |
01/17/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET G-0001; PROJECT DATA: REVISE THE 'TYPE OF USE' TO F-1 (FOOD PROCESSING) AND S-2 (LOW HAZARD STORAGE). 2. SHEETS I-1102 AND I-1103: PROVIDE A NORTH ARROW ON ALL PLANS. 3. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
01/29/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approv-Cond | MECHANICAL PLANS SHOW 2 SPLIT SYSTEMS WHILE ELECTRICAL ONLY HAS ONE. THIS APPROVAL IS ON ASSUMPTION THAT MECH DESGINER WILL DELETE ONE OF THE SYSTEMS AS UNNECESSARY. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/03/2014 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |
02/03/2014 | CPIERCE1 | REJECT SHELF | Completed |