Permit Number: T14CM00090
Parcel: 124082240

Address:
50 N MOUNTAIN AV

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T14CM00090
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/09/2014 MARTIN BROWN FIRE REVIEW Denied PLEASE CHANGE OCCUPANCY CLASSIFICATION TO I-1-KRB
01/13/2014 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
01/13/2014 RONALD BROWN BUILDING-COMMERCIAL REVIEW Reqs Change 1. no calcs, no specs, no geo tecs.
END OF REVIEW
01/14/2014 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Mountain Group Home
T14CM00090
Building Plan (1st Review)

TRANSMITTAL DATE: January 14, 2014

1. The building/foundation plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning has reviewed the building/foundation plans but cannot approve until a development package has been submitted and approved.

3. Zoning will re-review the building/foundation plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
01/17/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Clarify the plumbing code to be used for this activity. The Plumbing General Notes on sheet P-1 refer to the UPC but the water fixture unit analysis on sheet P-1 does not appear to be from the 2012 IPC. This review has been made using the 2012 IPC.
2. The plumbing drawing does not show the installation of any water piping for this phase of construction and the water calculation notes are apparently from a different project. Either remove the incorrect calculations or correct them; show only the work that will be part of this phase of construction. Reference: Section 107.2.1, IBC 2012.
3. If the installation of water service is part of this phase of construction, revise the site plan on sheet T-1 to show the pipe size for the water service to each building and specify the materials to be used. Reference: Section 107.2.1, IBC 2012 and Section 605.3, IPC 2012.
4. If the installation of water service is part of this phase of construction, provide the size of the water meters and backflow preventers serving these buildings. Reference: Section 107.2.1, IBC 2012.
5. Show the pipe size, inverts, and slopes for the building sewers, the pipe sizes of the public sanitary sewers and the invert and rim elevations of all manholes and cleanouts. Show the Pima County Wastewater Management Department (PCWMD) reference number for each public manhole or cleanout. Reference: Section 107.2.1, IBC 2012.
6. Provide the first floor elevation for each building. Where the first floor elevation is less than 12 inches above the elevation of the next upstream manhole in the public sewer or private sewer collection system, a backwater valve shall be installed in the building drain or branch of the building drain serving that floor. Floors discharging from above that reference point shall not discharge through the backwater valve. Reference: Section 715.1, IPC 2012, as amended by the City of Tucson.
7. Specify the materials to be used for the drainage piping and fittings. Reference: Section 702, IPC 2012.
8. The fixture branch or stack for a standpipe and fixture drain serving an automatic clothes washer shall be at least 3" in diameter. Reference: Section 406.2, IPC 2012.
9. Provide a floor drain (minimum size shall be 3") for the central clothes washing facilities per Section 412.4, IPC 2012.
10. An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow (i.e. one-way cleanouts). Reference: Sections 708.3.5 and 708.5, IPC 2012.
01/23/2014 JASON GREEN ENGINEERING REVIEW Reqs Change Engineering can not approve the building plan application until approval of the developmen tplan package, DP14-0005. Once all comments under DP14-0005 have been addressed and approved ENG will stamp the building plan approve. JG

Final Status

Task End Date Reviewer's Name Type of Review Description
02/05/2014 CPIERCE1 OUT TO CUSTOMER Completed
02/05/2014 CPIERCE1 REJECT SHELF Completed