Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: WALLS
Permit Number - T14BU00264
Review Name: WALLS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/13/2014 | STEVE SHIELDS | ZONING | REVIEW | Denied | P&DS TRANSMITTAL FROM: David Rivera, Principal Planner PROJECT: T14BU00264 1844 N. Vine Avenue Single Family Residence Proposed construction of a seven foot tall masonry wall, 277 linear feet in total length. TRANSMITTAL: March 18, 2014 COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1). This site is located in the R-1 zone (UDC 4.7.8). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.5 - 9. The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure's wall facing each interior property line (Table 6.3-2.A). COMMENT 1: The owner proposes to construct a seven foot tall masonry wall along the north and east property boundary. The wall along the north boundary meets setbacks but the wall along the east boundary is in two segments 25 feet and 22 feet as noted on the site plans. The owner proposes to construct a seven foot tall wall on the east property line. A DDO is required for the setback from the east boundary. The minimum setback is 6 feet the owner proposes 0-foot setback. The minimum setback to the front street perimeter property line is the greater of twenty (20) feet, or one and one-half (1 ½) the height of the proposed wall ((UDC 6.4.5.C.1.a). COOMENT 2: The owner proposes to construct a seven foot tall along the front street perimeter property line. The minimum setback required is 20 feet; the owner proposes to construct the wall on the property line. A DDO is required for a 0-foot setback. This site is comprised of three parcels and should be combined. As part of the DDO approval the request to combine the lots should be made. |
03/19/2014 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
03/19/2014 | DAVID RIVERA | NPPO | REVIEW | Passed | |
03/19/2014 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Passed |