Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2014 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
07/15/2014 | BLANCA ESPINO | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
07/15/2014 | BLANCA ESPINO | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
12/10/2013 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | PLANS # i-2006-036 ACTIVITY NUMBER: T13PI00024 PROJECT NAME: La Estancia De Tucson (spine roads) PROJECT ADDRESS: Via Bombachas & Via Pompas Morenas PROJECT REVIEWER: Matthew Geweke, Traffic Eng. Tech Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. Please include a response letter with the next submittal that states how all comments have been addressed and resubmit the original redline set of plans for back checking purposes. 1. Sht 3: Please make the Bike Routes lanes 6' wide as per current TDOT Standards. Change value throughout the rest of the plans accordingly. 2. Sht 18: Please update the Signing & Striping Notes - see attchments. 3. Please remove all gray scale shading from signing/striping plans. 4. Shts 19-22: Please make redline changes to plans as indicated. 5. Please add 'St. Name Sign Info' to Sht 18. See attached example. 6. Is the N-end of Via Bombachas a T-intersection or Dead End? 7. Please use attached Bull-nose/median gutter RPM detail where needed. If you wish to email me at Matthew.Geweke@tucsonaz.gov with a PDF of redlines and the corrected Shts with the revisions of these requested changes, we could expedite the Traffic Eng. acceptance/approval of these plans. I can also be reached in the office at 837-6665 with any questions. Thanks |
12/11/2013 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Medians on Camino Boleadoras - I assume these will be landscaped. If so, please submit planting and irrigation plans. Remember that private irrigation lines under a public road, must be placed in an irrigation easement. Also please sumbit a maintenance agreement showing La Estancia De Tucson to be responsible for long term landscape maintenance. Please submit a copy of the approved NPPO plans. |
12/30/2013 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | SUBJECT: La Estancia De Tucson-Spine Roads & Lots 331, 357, & 398 I-2006-036 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend a conditional approval. The following comments need to be addressed prior to in the subsequent review submittal. Please return redlined drawings with next submittal. 1. Include Development Services Department PIA activity number "T13PI00024"on cover sheet. 2. Align curb access ramp so that they are directly across from each other per section 10-01.3.3.E of the U.D.C. Technical Manual. 3. Indicate the ending and beginning of all proposed barricade railing. 4. A temporary turnaround will have to be provided where Via Bombachas intersects Via Rio Pico. The turnaround will need to be per section 10-1.6.2.C of the U.D.C. Technical Manual. 5. Indicate the asphalt paving phasing on Via Boleadores. 6. Indicate the placement of a removable post barricades and appropriate signing where the paving is proposed to end on Via Boleadores. 7. Indicate the class of pipe for all proposed storm drains. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |