Plan Review Detail
Review Status: Active
Review Details: PIA - SUBMITTAL
Plan Number - T13PI00023
Review Name: PIA - SUBMITTAL
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2014 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | SUBJECT: La Estancia De Tucson, Lot 331-410 I-2006-022 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend a conditional approval. The following comments need to be addressed prior to in the subsequent review submittal. Please return redlined drawings with next submittal. 1. Include Development Services Department PIA activity number "T13PI00022"on cover sheet. 2. Align curb access ramp so that they are directly across from each other per section 10-01.3.3.E of the U.D.C. Technical Manual. 3. A temporary turnaround will have to be provided at the proposed end of Via Arroyo Largo (184+00). The turnaround will need to be per section 10-1.6.2.C of the U.D.C. Technical Manual. 4. Indicate the placement of a removable post barricades and appropriate signing where the paving is proposed to end on Via Pampas Morenas Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
01/03/2014 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
12/02/2013 | ANY | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Active | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
12/02/2013 | ANY | PIA COORDINATOR | OUT TO CUSTOMER | Active | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
12/02/2013 | BESPINO1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
12/10/2013 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | PLANS # i-2006-022 ACTIVITY NUMBER: T13PI00023 PROJECT NAME: La Estancia De Tucson lots 331-410 PROJECT ADDRESS: 7600 S Kolb Rd PROJECT REVIEWER: Matthew Geweke, Traffic Eng. Tech Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. Please include a response letter with the next submittal that states how all comments have been addressed and resubmit the original redline set of plans for back checking purposes. 1. Sht 3: Please make the Bike Routes lanes 6' wide as per current TDOT Standards. Change value throughout the rest of the plans accordingly. 2. Sht 12: Please update the Signing & Striping Notes - see attchments. 3. Sht 12: Please make redline changes to plans as indicated. 4. Please add 'St. Name Sign Info' to plans. See attached pg. 5. Between Phase I & Phase II you will need to install standard bollards if more than 1 year delay, or less than a 1 year delay 'end of road" markers on posts would be fine. (See plans i-2006-015 Sht 26 for a redline note.) 6. Please show all public streets/make complete Signing plans for Phase II If you wish to email me at Matthew.Geweke@tucsonaz.gov with a PDF of redlines and the corrected Shts with the revisions of these requested changes, we could expedite the Traffic Eng. acceptance/approval of these plans. I can also be reached in the office at 837-6665 with any questions. Thanks… |
12/11/2013 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Just submit one copy of irrigation plans for the entire project. and one copy of the approved NPPO plans. |