Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T13PI00018
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/08/2014 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approved | PLANS # i-2013-015 ACTIVITY NUMBER: T13PI00018 PROJECT NAME: Cantera N Phase 1-72 PROJECT ADDRESS: Benson Hwy & Alvernon Wy PROJECT REVIEWER: Matthew Geweke, Traffic Eng. Tech Conditional Acceptance: Traffic Engineering recommends conditional approval of the PIA Plan; therefore a revised PIA Plan is not necessarily required for re-submittal plans but the following items must be revised or added to the plan. Just an email response with an exchange of PDF's is acceptable in lieu of a re-submittal. 1. See redline Shts 12, 13, 14 on the submitted drawing to address these redline comments: - Sht 12: please further clarify the NP sign with "BEGINS" or "ENDS" as appropriate, with the correct color font and sign border. - Sht 13: STOP signs are not needed on interior streets, please do not add them. - Do add the "ONE WAY" R6-1R to the KEY NOTES from Sht 12 - Please add sign sizes to the KEY NOTES - Please do call out the WS12 STOP Bar. - Nice, good note for the Temp Sign! "No foundation needed, direct bury okay" could be added for further clarification. - Sht 14: Nice graph, thanks! Please add size note for sign manufacturer. Please email me at Matthew.Geweke@tucsonaz.gov with a PDF of the corrected redline Shts showing the revisions of these requested changes, and Traffic Eng. will accept/approve these plans. I can also be reached at 791-4259 x76665 with any questions. Thanks |
04/14/2014 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Thanks for the letter from Andy D. I still need to see the landscape and irrigation plans. |
04/25/2014 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
04/25/2014 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | The plan seems to indicate a landscape buffer. We did not see any informartion on the landscaping and who would be responcible for the maintennace any vegetation and irrigation. Please clarify if there will be any landscaping and irrigation improvenments with this project and if they will be city maintained? No further questions. Lance Peterson, P.E. 837-6777 |
04/25/2014 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | Please submit Utility Plan Receipts. |
04/25/2014 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | April 24, 2014 SUBJECT: Contera - South Phase Lots 1 - 72 - I-2013-016 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval at this time. The following comments need to be addressed prior to in the subsequent review submittal. Please return redlined drawings with next submittal. 1. Sheet 3, Detail G: The cross slope of the ramp/landing area on the ramp must not exceed 50:1. A access ramp based on a ADOT C-Standards C-5.30 may be considered. Also, vehicle access ramps should be based on PC/COT Std. Dtl. 206. 2. Address redline comments from COT Streets and Traffic Maintenance - Electric Shop. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
04/25/2014 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
04/25/2014 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | Please submit Utility Plan Receipts. |
04/25/2014 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
04/25/2014 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
04/25/2014 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
04/25/2014 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
04/25/2014 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
04/25/2014 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
04/25/2014 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied |