Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T13PI00016
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/10/2014 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | March 10, 2014 SUBJECT: Valencia Crossing PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and recommends a conditional approval at this time. The following comments need to be addressed prior to the mylar plan set being submitted for signatures. Please return redlined drawings with next submittal. 1. Provide elevations for proposed median island. 2. Indicate the final surface treatment for the proposed median island. 3. Address comments on redline plan set. Responses may be noted on redline drawings. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
03/14/2014 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | PLANS # i-2013-017 ACTIVITY NUMBER: T13PI00016 PROJECT NAME: Valencia Crossing Infrastructure PROJECT ADDRESS: Benson Hwy PROJECT REVIEWER: Matthew Geweke, Traffic Eng Tech Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. Please include a response letter with the next submittal that states how all comments have been addressed and resubmit the original redline set of plans for back checking purposes. 1. See redlines on the submitted drawing Shts 6 & 7 to address these redline comments: Signs added to the plans do not have dimensions listed. Concerned with the need of double/triple posting some of the larger signs not being shown/called out. Concerns about the width of the SPR03 sign mounted on a 6' wide median - perhaps we should reconsider using two dual left turn signs for that left turn bay. On that note, the dual right probably should also be used in the dual turn bay sign. So... Brian Chimera please email me at Matthew.Geweke@tucsonaz.gov with a PDF of redline revisions so that we can fix the Traffic Eng. concerns and expedite acceptance/approval of these plans. I can also be reached at 837-6665 with any questions. Thanks Matthew Geweke |
04/24/2014 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
04/24/2014 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
04/24/2014 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |