Review Date Reviewer's Name Type of Review Description Status Comments
09/19/2014 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Completed
09/19/2014 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
09/19/2014 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Completed
09/19/2014 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Completed
09/19/2014 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
09/19/2014 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Completed
09/19/2014 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
09/19/2014 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Completed
09/19/2014 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
09/23/2014 GARY WITTWER DOT LANDSCAPE REVIEW Approved
10/13/2014 ESTEVAN TINEO DOT ENGINEERING REVIEW Denied T13PI00013 Granada Ave / Cushing Street Box Culvert Rio Nuevo Multipurpose Facilities District

1. Sheet 2 of 14: Notes 17 through 23 are grading notes which are not applicable to these right-of-way (public Drainage Easement in this case) improvements, please remove these notes.
2. Please include the Typical PIA notes to these plans.
3. The plan should note that any grading outside of the easement may require a grading permit.
4. Sheet 3 of 14: Provide recordation information for Public Drainage Easement.
5. Please note that existing light poles and bases must not be within the Drainage Easement.
6. Sheet 3 of 14: Note 20: Detail is for connecting to a stormdrain pipe, not box culvert. Detail how manhole structure will be connected to box culvert structure.
7. Sheet 6 of 14: Catch Basin along Federal Bkg. Will improvements require entering Federal property to construct and to maintain?
8. Drainage Design Comments:
a. Are the flows entering the proposed catch basin along the Federal building coincident with the flows from the TCC Wash. In other words, due these flows have differing times of concentration?
b. If the flows arriving at the "Catch basin Along Federal Blg" have differing times of concentration as compared to the TCC flows, then can the parallel storm drain be eliminated?
10/17/2014 JOSE ORTIZ DOT TRAFFIC REVIEW Approved October 17, 2014

PROJECT NAME: Granada Ave/Cushing Street Box Culvert
PLAN #: D-2013-001
ACTIVITY NUMBER: T13PI00013
PROJECT REVIEWER: Simon Ramos, EIT, Traffic Engineering, City of Tucson DOT

The Signing and Striping Section has completed the reviewed of the PIA plan and recommends approval at this time. The following comments need to be addressed in the subsequent plan submittal. Please return redlined drawings with next submittal and reference PIA activity number on all correspondences.

If you have any questions, I can be reached at 837-6678 or Simon.Ramos@tucsonaz.gov
11/12/2014 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved
11/13/2014 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed