Plan Number: T13PI00008
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T13PI00008
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/13/2013 JOSE ORTIZ DOT TRAFFIC REVIEW Denied PLAN #: U-2013-007
ACTIVITY NUMBER: T13PI00007
PROJECT NAME: Circle K at Valencia & Old Nogales Hwy
PROJECT REVIEWER: Matthew Geweke, Traffic Eng Tech

Resubmittal Required:
Traffic Engineering does not recommend approval of this PIA Plan; revised Plans requires re-submittal.
The following items must be revised or added to the plan. Please include a brief response letter with the next submittal that states how all comments have been addressed and the original redlined set of plans for back checking.

1. Signing & Striping notes are incomplete and incorrect, please see included attachments for current complete notes.

2. Signing requirements for right turn bays need correction. Use R3-5r & R3-5f combination. (note the R3-5f mounts above R3-5r).

3. Pavement Legends for both right turn bays need correction. Please provide measurements between legends.

4. The Valencia median One Way sign must be visible across 55' of roadway so please use the oversize 54x18 R6-1R, double posted.

I can also be reached via email Matthew.Geweke@tucsonaz.gov or at 791-4259 x76665 with any questions.
Thanks...!
06/18/2013 BESPINO1 UTILITY CLEARANCES COT STREETS DIVISION Denied
06/18/2013 BESPINO1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
06/18/2013 BESPINO1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
06/18/2013 BESPINO1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
06/18/2013 BESPINO1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
06/18/2013 BESPINO1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
06/18/2013 BESPINO1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied
06/24/2013 BESPINO1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
06/25/2013 GARY WITTWER DOT LANDSCAPE REVIEW Approved
06/26/2013 BESPINO1 UTILITY CLEARANCES COX COMMUNICATION Completed
07/10/2013 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed this plan and have the following comments:

1. Sheet 2 - There is no note 27
2. Sheet 3 - Pavement Section - Is this section matching the existing pavement section?
3. Sheet 4 and 5 - The A/3 identifier (cross-section) does not extend through all of the improvements.

No further comments.

Lance Peterson, P.E.
Streets and Traffic Maintenance
(520) 837-6777
07/17/2013 BLANCA ESPINO PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
07/17/2013 RICHARD LEIGH DOT ENGINEERING REVIEW Denied July 12, 2013

SUBJECT: Offsite Public Improvements for Circle K at Valencia Rd and Nogales Hwy.

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommends approval at this time. The following comments need to be addressed in the subsequent review submittal.

1. Sheet1: Include the plan number "U-2013-007" in the title block of each sheet.

2. Sheet 1: Include Development Services Department PIA activity number "T13PI00008"on cover sheet.

3. Include in legend all lines and symbols used in plan set.

4. Sheet 3: Provide recordation information for Nogales Hwy and Valencia Rd.

5. Sheet 3: The lateral transition and offset of the sidewalk along Nogales Hwy exceeds the maxim allowable per the City's Technical Standards Manual 10-01.3.3.D.1.C & D. Revise to sidewalk location to comply with standard.

6. Sheet 3: Indicate that the cross slope of the pedestrian crosswalk area for the new driveway will not exceed 2%.

7. Sheet 3: Provide spot grades along the saw cut lines along Valencia Rd. and Nogales Hwy.

8. Sheet 3: Provide a Valley gutter per PC/COT S.D. 208 at the proposed driveway entrance on Valencia and provide addition spot grades to ensure positive drainage.

9. Sheet 3: Show all existing and proposed easements in plan view.

10. Sheet 3: Provide a 25' radii on curb returns at the proposed driveway entrances.

11. Offsite flows which previously entered the site on the east side of the project are now being directed north along Nogales Hwy. Please provide a drainage statement addressing how the additional offsite flows will impact the intersection of Valencia Rd and Nogales Hwy along Nogales Hwy. Flows should be accepted and released essentially in the same location and magnitudes.
12. Include details for the relocation of the street lights and traffic signals. Please consult with Ernie Encinas, Ernie.Encinas@tucsonaz.gov, for requirements.

Refer to redline plans for additional comments and comment details.

If you have any questions, please contact me at 837-6647 or Richard.Leigh@tucsonaz.gov
07/17/2013 BLANCA ESPINO PIA COORDINATOR OUT TO CUSTOMER Completed