Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T13PI00007
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/16/2013 | BESPINO1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
05/16/2013 | BESPINO1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
05/16/2013 | BESPINO1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
05/16/2013 | BESPINO1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
05/16/2013 | BESPINO1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
05/16/2013 | BESPINO1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
05/16/2013 | BESPINO1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
05/16/2013 | BESPINO1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
05/16/2013 | BESPINO1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
06/12/2013 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
06/14/2013 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | June 12, 2013 SUBJECT: Haciendas at Wrightstown, Ohana Pl. PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommends approval at this time. The following comments need to be addressed in the subsequent review submittal. 1. Sheet 1: Include the plan number "I-2013-008" in the title block of each sheet. 2. Sheet 1: Include Development Services Department PIA activity number "T13PI00007"on cover sheet. 3. Sheet 1 & 2: Revise title block so that the title block information is identical on all sheets except for sheet number. Extraneous labeling such as details of sheet or the street name may be labeled above title block. Additionally, change title block on sheet 2 per TDOT drafting standards and include street name in title. 4. Sheet 2: Verify Stationing and elevations shown in plan and profile views. Some of the values show in the plan and profile views appear to conflict. 5. Sheet 2, Detail A: Indicate asphaltic asphalt mix #, per SSIP Sec 406, for proposed pavement section. 6. Sheet 2, Detail C: The catch basin grates are not aligned in the direction of storm water flows, per PC/COT Std. Dtl. 309. Grates are designed to have the bearing bars parallel to storm water flows and vehicle travel. 7. Sheet 2, Detail C: Indicate placement of reinforced concrete pipe per the Standards Manual for Drainage Design and Floodplain Management (SMDDFM) 10.3.9. 8. Sheet 2: Provide roadway centerline data. 9. Will the concentrated flows exiting the site through the new roadway increase scour along Wrightstown Road or adversely impact the adjacent parcels? Flow should be accepted and released essentially in the same location and magnatudes. 10. Drainage report: Provide a drainage report sealed per SMDDFM 2.3.1.1.F 11. Drainage Report: The longitudinal slope used in the roadway capacity calculation does not match slope proposed in the roadway paving plans; please clarify. Refer to redline plans for additional comments and comment details. If you have any questions, please contact me at 837-6647 or Richard.Leigh@tucsonaz.gov |
06/17/2013 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | i-2013-008 ACTIVITY NUMBER: T13PI00007 PROJECT NAME: Haciendas at Wrightstown - Ohana PL PROJECT ADDRESS: PROJECT REVIEWER: Matthew Geweke, Traffic Eng Tech Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. Please include a response letter with the next submittal that states how all comments have been addressed. 1. See redlines on the submitted drawing Sht 2 and address the additional redline comments. During the next submittal please re-submit the original roll of redlines for back checking purposes. 2. Please include signing and striping notes on plans as needed. See redline notes and attachment. If you wish to email me (Matthew.Geweke@tucsonaz.gov) a PDF of Sht 2 with the revision of these requested minor changes, we could expedite the Traffic Eng. acceptance of these plans. I can also be reached at 791-4259 x76665 with any questions. Thanks! Matthew Geweke |
06/18/2013 | BLANCA ESPINO | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
06/18/2013 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | SEE REDLINES. |
06/18/2013 | BLANCA ESPINO | PIA COORDINATOR | OUT TO CUSTOMER | Completed |