Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T13PI00006
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/14/2013 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approv-Cond | PIA: I-2013-007 ACTIVITY NUMBER: T132PI00006 PROJECT NAME: Linda Ave extension PROJECT ADDRESS: Mission Dist PROJECT REVIEWER: Matthew Geweke, Traffic Eng Tech Conditional Acceptance: Traffic Engineering recommends conditional approval of the PIA Plan; therefore a revised PIA Plan is not necessarily required for re-submittal but the following items must be revised or added to the plan. Please send me an email confirmation with a PDF of plans showing changes made is acceptable in lieu of a Traffic Eng. re-submittal. 1. See redlines Sht. 3 for the submitted note updating comments. 2. See redlines Sht. 4: please update minor corrections as noted. 3. See Traffic Eng notes attached to the accompanying cover letter. Please update your Signing & Striping Notes from the attached information provided. Thank you, If you have any questions, I can be reached at 791-4259 x76665 or email Matthew.Geweke@tucsonaz.gov |
05/14/2013 | BESPINO1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
05/14/2013 | BESPINO1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
05/14/2013 | BESPINO1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
05/14/2013 | BESPINO1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
05/14/2013 | BESPINO1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
05/14/2013 | BESPINO1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
05/14/2013 | BESPINO1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
05/14/2013 | BESPINO1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
05/14/2013 | BESPINO1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
05/31/2013 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | May 30, 2013 SUBJECT: Linda Avenue Extension Roadway Improvements I-2013-07 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommends approval at this time. The following comments need to be addressed in the subsequent review submittal. 1. Sheet1: Include the plan number "I-2013-007" in the title block of each sheet. 2. Sheet 1: Include Development Services Department PIA activity number "T13PI00006"on cover sheet. 3. Sheet 1: Provide roadway dedication recordation information. 4. Submit a drainage report for the roadway improvements per the City Standards Manual for Drainage Design and Floodplain Improvements with re-submittal. 5. Sheet2: Provide cross sections references in plan view. 6. Sheet 2: Accurately depict existing conditions including the modern street car amenities and exsiting and proposed utilities. 7. Sheet 2: Provide roadway centerline data. 8. Sheet: 2 Provide vertical curve data. 9. Sheet 2: Provide stationing, and offsets for all curb BCRs, ECRs and angle points. Also indicate the radii for the curb returns and parking islands. 10. Sheet 2: Indicate the final surface treatment for buffer area between cur and sidewalk and within the parking islands. 11. Sheet 2: Provide a minimum 6" buffer between the proposed sidewalk and right-of-way limits. 12. Sheet 2: Provide an ADA accessible route across Linda Avenue at intersection located at Sta.+/- 16+20. 13. Sheet: 2: Indicate the placement of post barricades behind the concrete headers at the future private roadway turnouts. 14. Sheet 2: Indicate asphaltic concrete mix number per Pima County Standards for Public improvements. 15. Sheet 2: Indicate the placement of survey monuments along roadway centerline at the ends of horizontal curves and at roadway intersections. 16. Sheet 2: Detail 2 Correct detail references. 17. Sheet 2: The street centerline at the intersection located at Sta.+/- 16+20 does not comply with the Technical Standards Manual (TSM) alignment requirements. The minimum centerline offset is 150 feet per TSM 10-01.6.3. Refer to redline plans for additional comments and comment details. If you have any questions, please contact me at 837-6647 or Richard.Leigh@tucsonaz.gov |
06/12/2013 | BLANCA ESPINO | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
06/12/2013 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Completed | |
06/12/2013 | BLANCA ESPINO | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
06/12/2013 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approv-Cond | We have reviewed this plan and conditionally approve the project. We have the following questions for clarification: 1. Sheet 2 - Detail 2 - The area next to the track is not calling for the structural concrete detail. Is this suppose to be structural concrete or one of the pavement sections listed in detail 3? 2. What will be the asphalt mix used on the project. Will it be a mix #2? No further questions. Lance Peterson, P.E. Streets and Traffic Maintenance (520) 837-6777 |