Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T13PI00005
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/29/2013 | BESPINO1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
05/29/2013 | BESPINO1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
05/29/2013 | BESPINO1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
05/29/2013 | BESPINO1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
05/29/2013 | BESPINO1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
05/29/2013 | BESPINO1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
05/29/2013 | BESPINO1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
05/29/2013 | BESPINO1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
05/29/2013 | BESPINO1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
05/31/2013 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approved | Resubmittal might not be Required: Traffic Engineering does not recommend immediate approval of this PIA Plan; revised Plans might not need to be required for re-submittal if we can make these minor corrections via email exchanges. -Otherwise----- The following items must be revised or added to the plan. Please include a brief response letter with the next submittal that states how all comments have been addressed. 1. See redlines on the submitted drawings and address the additional redline comments to remove superfluous information on striping sheets. 2. Call-out the newly noted signs along E-bound 22nd St on Sht 4. ----------------- Please email me (Matthew.Geweke@tucsonaz.gov) a PDF of Sht 4 of these requested minor changes/additional info so that we can expedite acceptance of these plans. I can also be reached at 791-4259 x76665 with any questions. Thanks! |
06/04/2013 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approved | June 4, 2013 SUBJECT: St. Augustine Catholic High School Offsite Public Paving Improvements PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and recommends a conditional approval at this time. The following comments need to be addressed prior to submittal of mylar plan set for final review and approval. 1. Sheet 2: In order to accommodate a future 6' wide sidewalk. (TSM 10-01.4.1.A) along 22nd Street, indicate the placement of 6' wide curb access ramps at proposed driveway. 6' wide sidewalk can be transitioned to 4' to match existing. Additionally indicate the placement of 6" reveal curb behind curb access ramp on the east side of driveway 2. Sheet 2: Will placement of sidewalk at abandoned driveway entrance alter existing drainage patterns? Is a sidewalk scupper warranted per Technical Standards Manual Sec. 10-01.4.4?. Refer to redline plans for additional comments and comment details. If you have any questions, please contact me at 837-6647 or Richard.Leigh@tucsonaz.gov |
06/05/2013 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
06/10/2013 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
06/18/2013 | BLANCA ESPINO | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
06/18/2013 | BLANCA ESPINO | PIA COORDINATOR | OUT TO CUSTOMER | Completed |