Plan Number: T13PI00004
Parcel: Unknown

Review Status: Completed

Review Details: PIA - RESUBMITTAL

Plan Number - T13PI00004
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/04/2013 BESPINO1 UTILITY CLEARANCES COT STREETS DIVISION Denied
06/04/2013 BESPINO1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
06/04/2013 BESPINO1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied
06/06/2013 JOSE ORTIZ DOT TRAFFIC REVIEW Approved PIA: I-2013-003
ACTIVITY NUMBER: T132PI00004
PROJECT NAME: UofA Sci Pk / Kolb Rd Imp.
PROJECT ADDRESS: Kolb & Sci Pk Dr
PROJECT REVIEWER: Matthew Geweke, Traffic Eng Tech

Conditional Acceptance:
Traffic Engineering recommends conditional approval of the PIA Plan; therefore a revised PIA Plan is not necessarily required for re-submittal but the following items must be revised or added to the plan.
Sending me an email confirmation with a PDF of plan sheet 7 showing changes made is acceptable in lieu of a full Traffic Eng. re-submittal.

1. Please do call out the keep right median bull-nose signs as "R4-7" if that is indeed what they are.

2. W/leg: E-bound requires two SPR03-09 signs please.

3. W/leg: Please provide width of the "Thru/Rt Tun" lane

4. "NEW" goes above the 'Signal Ahd' sign, unless we already discussed.

5. E/leg: W-bound 'Signal Ahd' 350' placement is excessive in distance from intersection at 25mph. Please either oversize the sign to 36x36 w/double post -OR- move sign closer to intersection (200'-250'max) and 5' from EOP

6. I suggest lightening up the gray scale, when the striping crew is given a 8.5x11 photo copy, it may become a dark unreadable box.

Thank you,

If you have any questions, I can be reached at 791-4259 x76665 or email Matthew.Geweke@tucsonaz.gov
06/21/2013 BESPINO1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
06/21/2013 BESPINO1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
06/21/2013 BESPINO1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
06/21/2013 BESPINO1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
06/21/2013 BESPINO1 UTILITY CLEARANCES COX COMMUNICATION Completed
06/21/2013 BESPINO1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
06/25/2013 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approv-Cond We have reviewed this plan and have only one comment. Please provide a signature line for Streets and Traffic Maintenance.

No further comments.

Lance Peterson, P.E.
(520) 837-6777
06/26/2013 RICHARD LEIGH DOT ENGINEERING REVIEW Approv-Cond June 26, 2013

SUBJECT:UofA - Science Park Drive / Kolb Road Improvements I-2013-003 T13PI00004

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

Permits and Codes Section has reviewed the PIA Plan and recommends a conditional approval at this time. The following comments need to be addressed prior to submittal of mylar plan set for final review and approval.

1. See redlines for comments.
07/01/2013 BLANCA ESPINO PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
07/01/2013 GARY WITTWER DOT LANDSCAPE REVIEW Approved
07/01/2013 BLANCA ESPINO PIA COORDINATOR OUT TO CUSTOMER Completed