Plan Number: T13PI00003
Parcel: Unknown

Address:
2085 E GANLEY RD

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T13PI00003
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/15/2013 BESPINO1 UTILITY CLEARANCES COT STREETS DIVISION Completed
03/15/2013 BESPINO1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
03/15/2013 BESPINO1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
03/15/2013 BESPINO1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
03/15/2013 BESPINO1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
03/15/2013 BESPINO1 UTILITY CLEARANCES COX COMMUNICATION Completed
03/15/2013 BESPINO1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
03/15/2013 BESPINO1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
03/15/2013 BESPINO1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
03/19/2013 JOSE ORTIZ DOT TRAFFIC REVIEW Approved
04/12/2013 GARY WITTWER DOT LANDSCAPE REVIEW Denied TDOT already has landscape and irrigation in these ROW areas. How will the trees be watered and who will maintain them.
04/12/2013 RICHARD LEIGH DOT ENGINEERING REVIEW Denied April 10, 2013

SUBJECT: Offsite Improvement Plan CAID Industries, Bilby Road

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommends approval at this time. The following comments need to be addressed in the subsequent review submittal.

1. Sheet1: Include the plan number "U-2013-004" in the title block of each sheet.

2. Sheet 1: Include Development Services Department PIA activity number "T13PI00003"on cover sheet.

3. Sheet 1: Revise title block so that the title block information is identical on all sheets except for sheet number. Extraneous labeling such as details of sheet or the street name may be labeled above title block. Additionally, include the Bilby Road in the plan title.

4. Sheet 2: Depict and label reconfigured drainage easement on plan view. Submit revised easement language for review. The easement area south of the security wall/trash fence must be a flowage easement to the City.

5. Sheet 3: Clearly label any details that are not part of the PIA with "NOT PART OF PIA".

6. Sheet 4: Provide Stationing and offsets for BCRs and ECRs of new driveway; use COT paving plan I-97-61 stationing.

7. Sheet 4, Dtl. 2/4: Provide a curb access ramp per PC/COT S.D. 207 and vertical curb per PC/COT S.D. 209 on east side of driveway.

8. Sheet 4, Dtl. 1/4: Provide a cross section, perpendicular to the channel, of the proposed reconfigured box culvert entrance.

9. Sheet 4, Dtl. 1/4:Provide a detail which clearly shows the limits of the existing wing walls removals and a detail showing the new gunite slope protection connection to existing wing wall.

Refer to redline plans for additional comments and comment details.

If you have any questions, please contact me at 837-6647 or Richard.Leigh@tucsonaz.gov
04/15/2013 BLANCA ESPINO PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
04/15/2013 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Completed
04/15/2013 BLANCA ESPINO PIA COORDINATOR OUT TO CUSTOMER Completed