Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/15/2013 | BESPINO1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
03/15/2013 | BESPINO1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
03/15/2013 | BESPINO1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
03/15/2013 | BESPINO1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
03/15/2013 | BESPINO1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
03/15/2013 | BESPINO1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
03/15/2013 | BESPINO1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
03/15/2013 | BESPINO1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
03/15/2013 | BESPINO1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
03/19/2013 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approved | |
04/12/2013 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | TDOT already has landscape and irrigation in these ROW areas. How will the trees be watered and who will maintain them. |
04/12/2013 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | April 10, 2013 SUBJECT: Offsite Improvement Plan CAID Industries, Bilby Road PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommends approval at this time. The following comments need to be addressed in the subsequent review submittal. 1. Sheet1: Include the plan number "U-2013-004" in the title block of each sheet. 2. Sheet 1: Include Development Services Department PIA activity number "T13PI00003"on cover sheet. 3. Sheet 1: Revise title block so that the title block information is identical on all sheets except for sheet number. Extraneous labeling such as details of sheet or the street name may be labeled above title block. Additionally, include the Bilby Road in the plan title. 4. Sheet 2: Depict and label reconfigured drainage easement on plan view. Submit revised easement language for review. The easement area south of the security wall/trash fence must be a flowage easement to the City. 5. Sheet 3: Clearly label any details that are not part of the PIA with "NOT PART OF PIA". 6. Sheet 4: Provide Stationing and offsets for BCRs and ECRs of new driveway; use COT paving plan I-97-61 stationing. 7. Sheet 4, Dtl. 2/4: Provide a curb access ramp per PC/COT S.D. 207 and vertical curb per PC/COT S.D. 209 on east side of driveway. 8. Sheet 4, Dtl. 1/4: Provide a cross section, perpendicular to the channel, of the proposed reconfigured box culvert entrance. 9. Sheet 4, Dtl. 1/4:Provide a detail which clearly shows the limits of the existing wing walls removals and a detail showing the new gunite slope protection connection to existing wing wall. Refer to redline plans for additional comments and comment details. If you have any questions, please contact me at 837-6647 or Richard.Leigh@tucsonaz.gov |
04/15/2013 | BLANCA ESPINO | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
04/15/2013 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Completed | |
04/15/2013 | BLANCA ESPINO | PIA COORDINATOR | OUT TO CUSTOMER | Completed |