Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T13PI00002
Review Name: PIA - SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/04/2013 | BESPINO1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
| 03/04/2013 | BESPINO1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
| 03/04/2013 | BESPINO1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
| 03/04/2013 | BESPINO1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
| 03/04/2013 | BESPINO1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
| 03/04/2013 | BESPINO1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
| 03/04/2013 | BESPINO1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
| 03/04/2013 | BESPINO1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
| 03/06/2013 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approv-Cond | ACTIVITY NUMBER: T132PI00002 PROJECT NAME: Offsite Imp. SSA Tucson, First Ave & Smoot Dr PROJECT ADDRESS: PROJECT REVIEWER: Matthew Geweke, Traffic Eng Tech Conditional Acceptance: Traffic Engineering recommends conditional approval of the PIA Plan; therefore a revised PIA Plan is not necessarily required for re-submittal but the following items must be revised or added to the plan. Just an email response with an exchange of PDF's is acceptable in lieu of a re-submittal. 1. See redlines on the submitted drawings and address the additional redline comments on Sht: 3 Please; relocate the NP signs, and callout the unknown sign. 2 See Traffic Eng note attached to the accompanying cover letter. Please update the Signing & Striping Notes from the attached information provided. If you have any questions, I can be reached at 791-4259 x76665 or email Matthew.Geweke@tucsonaz.gov |
| 03/07/2013 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | Thanks for submitting the NPPO Plans. Can you submit the final with DSD approved stamp next submittal. |
| 03/25/2013 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | February 13, 2013 SUBJECT: Offsite Improvement Plan for SSA Tucson, First Avenue & Smoot Drive PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommends approval at this time. The following comments need to be addressed in the subsequent review submittal. 1. Include the plan number “U-2013-003” in the title block of each sheet. 2. Include Development Services Department PIA activity number “T13PI00002”on cover sheet. 3. Revise title block so that the title block information is identical on all sheets except for sheet number. Extraneous labeling such as details of sheet or the street name may be labeled above title block. Additionally, include the Smoot Drive and First Avenue in the plan title. 4. Show all proposed improvements along 1st Ave. 5. Provide a full curb access ramp at the southeast corner of 1st Ave. and Smoot Dr. per PC/COT S.D. 207, Sht. 1 of 5. Proposed access ramp configuration is not per COT standards. 6. Provide spot grades along proposed pavement sawcut line within Smoot Dr. 7. Provide recordation information for right-of-way dedication. If dedication has not been completed then provide place holder to be filled out later. 8. Provide sidewalk, including curb access ramps at driveways, for the entire width of the property along the Smoot Drive. 9. Provide a curb transition per PC/COT S.D. 210 where the curb is proposed to join existing curb on Euclid Avenue. 10. Indicate cross slope for the proposed pavement section along Smoot Drive. Refer to redline plans for additional comments and comment details. If you have any questions, please contact me at 837-6647 or Richard.Leigh@tucsonaz.gov |
| 03/26/2013 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
| 03/26/2013 | BLANCA ESPINO | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 03/26/2013 | BLANCA ESPINO | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
| 04/22/2013 | BESPINO1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed |