Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM07293
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/02/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET CV; BUILDING CODE: REVISE THE ACCESSIBILITY CODE TO THE ICC/ANSI A117.1-2009 EDITION. 2. SHEET CV; BUILDING DATA: REVISE THE OCCUPANCY CLASSIFICATION TO A2. 3. SHEET CV; LIFE SAFETY AND KEY PLAN: ALTHOUGH THIS PLAN IS FOR REFERENCE ONLY, THE EXIT DOOR IN THE STORAGE AREA SHOULD NOT BE SHOWN AS AN EXIT DISCHARGE, OR HAVE EXIT TRAVEL INDICATED, SINCE THE IBC SECTION 1014.2(4) DOES NOT ALLOW EGRESS THROUGH STORAGE ROOMS. VERIFY. 4. SHEET CV; GENERAL NOTES: REVISE THE SECOND NOTE TO THE 2009 ICC/ANSI A117.1. 5. SHEET CV; DRAWING INDEX: REVISE EITHER THE INDEX FOR SHEETS GD1.0, GD1.1, GD1.2, AND GD1.3 TO MATCH THE ACTUAL SHEET NUMBERS (1, 2, 3, AND 4 OF 4), OR REVISE THE ACTUAL SHEET NUMBERS. 6. SHEET G0.0; ADA REQUIRED CLEARANCES KEY NOTES: REVISE THESE NOTES TO THE 2009 ICC/ANSI A117.1. 7. SHEET SD.2; DETAIL 8: REVISE THE DISTANCE FROM THE BOTTOM OF THE PARKING SIGN TO THE PAVEMENT TO 7'-0". 8. SHEET D2.0; ELEVATION 2: ABOVE THE MCDONALD'S SIGNAGE, A DEMOLITION NOTE IS NOT COMPLETED. REVISE. 9. SHEET A1.1; SECTION 2: PROVIDE THE CONNECTION SIZE AND QUANTITY OF THE GUSSETT PLATE TO THE DOUBLE 2X4, AND THE DIAGONAL BRACE TO THE GUSSETT PLATE. 10. SHEET A1.1; SECTION 3: PROVIDE THE CONNECTION SIZE AND QUANTITY OF THE 2X4 HANGER TO THE ROOF JOIST. INCLUDE A DETAIL OF HOW THE HANGER IS SUPPORTED AT THE ROOF STRUCTURE. 11. SHEET A1.1; SECTION 4: PROVIDE THE CONNECTION SIZE AND QUANTITY OF THE LATERAL BRACE TO THE VERTICAL STUD AND TO THE STRUCTURE ABOVE. INCLUDE A DETAIL OF HOW THE BRACE IS SUPPORTED AT THE STRUCTURE ABOVE. 12. SHEETS A3.1, A3.2, A3.3, A3.4, A3.5, AND A4.0: PROVIDE NOTES ON THESE SHEETS TO REFERENCE CONSTRUCTION KEY NOTES AND WALL ASSEMBLY TYPES. 13. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 01/02/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Demonstrate energy code compliance for the alterations to the building envelope (e.g. new storefront system, new glazing) using calculations based on the current code. Provide sufficient detail on the drawings to confirm the energy compliance of the alterations to the building envelope. The information shall, as a minimum, include the U-factors and the SHGC of the fenestration components. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012. 2. Show that the proposed replacement rooftop units meet the requirements of Sections C403.2.2, C403.2.3, C403.2, and C403.3 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. 3. Show the size, routing, and termination of the condensate drains from the new rooftop units. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson. 4. Provide calculations demonstrating adequate ventilation for the building using the current code. Reference: Section 403.2, IMC 2012. 5. Verify that the proposed Type I hoods are equipped to automatically start their respective hood exhaust fan when cooking operations commence. Reference: Section 507.2.1.1, IMC 2012. |
| 01/02/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide sufficient information to show that the installation of the new plumbing fixtures will not cause the existing water supply and sanitary waste systems to become locally overloaded (i.e. show the complete systems with pipe sizes). Reference: Section 107.2.1, IBC 2012. 2. The building has a gravity grease interceptor; verify that the new horizontal branches from the restrooms do not connect to the existing grease waste drain. Reference: Section 1003.3.1, IPC 2012. 3. Sheet A1.2 notes a "scupper and new gutter" being installed; provide the dimensions of these items. Reference: Section 1106.1, IPC 2012. 4. Provide a complete diagram of the natural gas distribution system showing the all of the pressures, loads, developed lengths, and the layout of the distribution piping. Reference: Section 107.2.1, IBC 2012. |
| 01/02/2014 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 01/06/2014 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 01/06/2014 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | T13CM07293 TI-McDonalds 6651 E Tanque Verde Rd Comply with the City of Tucson Electrical Commercial Submittal Requirements found at www.tucsonaz.gov/pdsd; Permit Review; Commercial Permits; Commercial Plan Review A Registered Electrical Engineer seal is required when the design exceeds 400 amps. This design shows 940 connected amps. 1. Electrical floor plan: provided sheet E2.0. 2. Single line diagram of service for building: provide for review. 3. Panel schedule information: clarify the panel description on sheet E1.1 for circuits LP:23,25 shown on the OPF wiring detail sheet E2.0. 4. Lighting fixture information: a. Clarify the undersized plan notation for fixtures LED6D & LED8D sheet E3.0. b. Provide the location of all scheduled fixtures on the plans including F2, F14, F14A, M1, LED3, LED4, LED6 & CL4A and list the quantity of each fixture type. 5. 2012 IECC (interior) lighting calculation: use ComCheck report, or Table C405.5.2(1) building area or (2) space-by-space for budget determination: provide for review. 6. City of Tucson Outdoor Lighting Code (Ord #10963) compliance: All changes to any outdoor lighting site or building, must comply with this ordinance. Compare total fixture output to the budget based on property size and location (Table 401.1). The ordinance requires identification of each fixture type (both Full-Cut-Off and un-shielded); and fixture output based on a typical lamp lumen output at the maximum fixture wattage rating. a. Include Full-Cut-Off wall sconce S1, LED6D & LED8D sheet E3.0. b. Include Unshielded UP accent fixture LED8 sheet E3.0. The 2012 Outdoor Lighting Code may be found on The City of Tucson Website under: www.tucsonaz.gov/pdsd; Codes, Standards, Ordinances & Guidelines; Building Codes. Ken Van Karsen Elect Plan Review PDSD, City of Tucson 520-837-4912 Kenneth.VanKarsen@tucsonaz.gov |
| 01/14/2014 | CPIERCE1 | WWM | REVIEW | Completed | |
| 12/24/2013 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Esperanza SDA Church T13CM07293 Building Plan (1st Review) TRANSMITTAL DATE: December 24, 2013 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning has reviewed the building plans but cannot approve until a development package has been submitted and approved for the site changes 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 12/24/2013 | JASON GREEN | ENGINEERING | REVIEW | Needs Review | Building plan can not be approved until a development plan package is submitted, reviewed and approved by all sections. Due to site changes a DP Package is required. |
| 12/30/2013 | KEN BROUILLETTE | FIRE | REVIEW | Denied | Please update fire code edition to the 2012 as adopted by the City of Tucson. Please provide an occupant load calculation for the building. Provide a seating plan and indicate if fixed seating will be used and where. Please indicate the emergency egress lighting locations on the electrical pages. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/23/2014 | CPIERCE1 | REJECT SHELF | Completed |