12/03/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET C1.0; SCHEDULE OF DRAWINGS: THE SCHEDULE INDICATES A SHEET C1.1, WHILE THE DRAWING IS NOTED AS SHEET C1.2. CLARIFY. 2. SHEET A2.1; LOADING DOCK BASIN PLAN 2: THE PLAN SHOWS A SECTION 4/A2.1 CUT AT THE SUMP PIT, WHILE THE SECTION IS SHOWN AS 3. CLARIFY. 3. STRUCTURAL CALCULATIONS; SHEET 1 (SOIL): THE CALCULATIONS INDICATE A SOIL REPORT WAS USED FOR THE FOUNDATION DESIGN. PROVIDE THAT REPORT FOR REVIEW. 4. STRUCTURAL CALCULATIONS; PAGE 14: WHERE DOES THIS CONCRETE BASEMENT WALL DESIGN OCCUR ON THE PLAN? VERIFY. 5. STRUCTURAL CALCULATIONS; PAGE 14: THE CONCRETE DESIGN STRENGTH SPECIFIED IN THIS CALCULATION IS 3000 PSI, ALTHOUGH THE STRUCTURAL GENERAL NOTES INDICATE 2500 PSI. CLARIFY. 6. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
12/06/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/16/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/16/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Install the underground duct with a minimum slope of 1/8" per foot to allow drainage to a point of access. Reference: Section 603.8.1, IMC 2012. |
12/16/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The development package must be approved before the building plan may be approved. |
12/16/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Revise the size of the combination drain and vent pipe to correspond to the requirements of Table 915.3, IPC 2012 (a 2" pipe can accommodate no more than 4 drainage fixture units). |
12/16/2013 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: PDSD Zoning Review Section David Rivera Principal Planner PROJECT: T13CM07181 1515 E Ajo Way Foundation Plan approval only TRANSMITTAL DATE: December 16, 2013 DUE DATE: December 27, 2013 COMMENTS: 01. Zoning has reviewed the plans for the foundation only and while they are in substantial compliance with the development package site plan submitted for review, zoning cannot approve the foundation plan until the development package is approved. Once the development package site and grading plan is approved zoning can approve the foundation plan. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/03/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
01/03/2014 | CPIERCE1 | REJECT SHELF | Completed |