Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T13CM07160
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/29/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
12/06/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/10/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. No permit is to be issued until approval for concrete entry steps encroachment into the right of way has been approved. 2. Please provide certification of special inspectors. SHEET1-2 3. Table 602 of the 2012 IBC required a 1 hour rated wall if closer than 10' to the property line. This applies to all 90 degree turn in that wall up to the 10' separation point. Please continue the 1 hour rating for the front, rear and court yard walls at least 6'-9 1/8" past the wall parellel to the property line. 4. Please reference all wall sections. 5. Provide a 5' turn around in the entry corridor and in the kitchenette. 6. Show direction and percentage of slope of the concrete walkway parellel with the building. 7. Please provide an accessible shower as per ICC A117.1, Section 608. 8. Provide a typical interior wall section braced to the structure above. 9. The fenestration detail at the east deck looks like windows. Detail a sliding door configuration as per door schedule. SHEET A-4 10. Details 2 and 5: Show the 1 hour wall shaded as noted. 11. Details 10 and 11: Provide a vertical grab bar as per ICC A117.1, Section 604.5.1. 12. Detail 12: Show all accessible requirements for the shower as per section 608; i.e. grab bars, seat and controls. SHEET S-1 13. Detail 3: a. Show detail reference through metal awning b. Section 1/A-6 wrong reference number. END OF REVIEW |
12/17/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the site drawing to show the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2012. 2. Coordinate the plumbing plans with the plumbing fixture schedule; P3 and P4 appear to be reversed on the plumbing plans. 3. Provide tempered water for the lavatory using an approved device conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. 4. Indirect waste receptors shall not be installed in a closet or cupboard, or unventilated space. Reference: Section 802.3, IPC 2012. |
12/18/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2, C401.2, and C406, International Energy Conservation Code 2012. 2. Verify the structural calculations for the support of the heat pump; the structural plans call for a maximum unit weight of 500 ponds but the mechanical plans indicate a weight of 625 pounds. Reference: Section 302.1, IMC 2012. 3. Verify that the operation and maintenance clearance on the power inlet side of the heat pump is adequate and that the equipment is being installed in accordance with the conditions of its listing and the manufacturer's installation requirements. Reference: Section 304.1, IMC 2012. |
12/18/2013 | ROBERT SHERRY | WATER | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/20/2013 | CPIERCE1 | REJECT SHELF | Completed |