Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM07037
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/20/2013 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 11/20/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide ventilation calculations using the Section 403.3, 2012 IMC. 2. The exhaust rate for the restroom shall be at least equal to the supply air flow rate. 3. Clarify the nature of the rooftop unit: heat pump or gas pack? |
| 11/20/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a thermostatic mixing valve for the lavatory listed to ASSE 1070. The maximum hot water temperature shall be 110 degrees Fahrenheit. 2. Clarify the waste and vent piping diagram. |
| 11/20/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 11/20/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET D1.0; KEYNOTES: NOTES 6 AND 7 WERE NOT LOCATED ON THE PLAN. VERIFY. 2. SHEET A1.0; DETAIL AA: PROVIDE THE BRACE SIZE. 3. SHEET A1.0; INTERIOR PARTITION A; DETAIL 4: THE INTERIOR PARTITION A INDICATES THE WALL STOPS JUST ABOVE THE CEILING AND REQUIRES BRACING, WHILE DETAIL 4 INDICATES THE WALL EXTENDS TO THE EXISTING TRUSS AND REQUIRES NO ADDITIONAL BRACING. CLARIFY. |
| 11/20/2013 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 11/20/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 11/20/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 11/27/2013 | SPOWELL1 | WWM | REVIEW | Needs Review | |
| 11/27/2013 | SPOWELL1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |