Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM07031
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/10/2014 | FRODRIG2 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 02/10/2014 | FRODRIG2 | WWM | REVIEW | Needs Review | |
| 12/03/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide tempered water for the lavatories and public hand-washing sinks using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. 2. For the use of PEX tubing, provide a branch tube sizing chart showing the correct size of PEX tubing to be used as a substitute for the copper pipe shown on the drawings. Reference: Sections 303.2 and 604.3, IPC 2012. 3. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. the clothes washer). Reference: Section 604.9, IPC 2012. 4. Show how accommodation for the thermal expansion of the hot water system is being provided. Reference: section 607.3, IPC 2012. 5. Provide cleanouts sized for the nominal size of pipes that they serve up to 4-inches (i.e. the floor cleanout,P-9, and the wall cleanout, P-13, are shown as serving drains larger than their listed sizes). Reference: Section 708.7, IPC 2012. 6. Provide separate indirect waste pipes for each compartment of the 3-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012. 7. Show how the flow control device can be installed below the floor level with ready access (defined as being able "to be directly reached without requiring the removal or movement of any panel, door or similar obstruction") and in accordance with the manufacturer's instructions. Reference: Sections 202 and 1003.4.2, IPC 2012. |
| 12/03/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 12/03/2013 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 12/03/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 12/03/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
| 12/03/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 12/04/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM07031 1. Provide a drawing of the entire service,size,type,ampacity and location. Ray Majuta 12/04/2013 PDSD, Tucson Elect Plan Review. |
| 12/09/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied |