Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T13CM07030
Parcel: 117042630

Address:
222 E 5TH ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM07030
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/05/2013 JASON GREEN ENGINEERING REVIEW Reqs Change Building Plan will be approved upon approval of the DP Package. JG
12/10/2013 KEN BROUILLETTE FIRE REVIEW Approved
12/11/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
12/17/2013 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: 222 E. 5th Street
T13CM07030
Building Plan (1st Review)

TRANSMITTAL DATE: December 17, 2013

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Until the development package has been approved the building plans cannot be approved.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
12/17/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Reqs Change GENERAL
1. The 36 x 48 sheet size is not well received here. They are not standard and do not fit any layout table available. Please do not submit another project using sheets of this size.
2. Provide certification of special inspectors.
3. Provide structural calculations for the following:
a. Al new roof top mounted HVAC equipment.
b. Wall mounted water heaterS including wall analysis.
SHEETS A2.1, A2.2, AND A2.3
4. Provide a graphic distinction between architectural elements that are existing to remain and architectural elements that are new.
5. Provide a detail code analysis that allows the two exit stairs to be open and not rated including the atrium at the third level.
6. Please provide a set of existing/demolition floor plans.
a. Clarify whether the toilets are existing remodeled or new.
7. Please delete all key notes not specific to the sheet they are listed.
8. Several details are referenced to detail "X" which is non existent. Please correct these references to the correct detail.
9. Provide north arrows for all plans and partial plans.
SHEET A1.0
10. The 2012 IBC, Table 2902.1 calls for three water dispensers. Only two are shown on the plans. Please provide a third one.
11. Once approved, please include a copy of the development plan.
12. Please verify and maintain a one hour rating around the elevator equipment room.
13. At note 36, state that the sink is to be no more than
2'-10" above finished floor.
14. The slope of the elevator walkway to the corridor is greater than 5% and is considered a ramp and subject to requirements of 2009 ICC A117.1, Section 405 . Please show actual slope percentage and add handrails to both sides of the ramp.
SHEET A2.2
15. At meeting room 208:
a. Add hand/guard rail to other side of steps down.
b. Call out and identify the stadium seating.
16. The lounge 222 sink is to be no higher that 2'-10" above finished floor.
17. Provide water dispenser in the waiting room.
SHEET A2.3
18. Finish the closure wall with door at rooms 311 and 312.
SHEET A6.0 AND 6.2
19. Finish the details
20. Provide handrails at all stairs.
SHEET A7.0, A7.1, A7.2, AND A7.3
21. Finish these sheets
SHEET A8.0
22. At detail 12, the sink is to be no higher than 2'-10" above finished floor.
23. Finish this sheet.
SHEET A8.1
24. Finish referencing, dimensioning and show wall finishes.
25. Show all accessible requirements and include the following: dimensions, clearances, fixtures, accessories, all finishes, exposed pipe insulation and signage as per the 2012 IBC, Chapter 11 and 2009 ICC A117.1.
END OF REVIEW
12/30/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the systems list of the Mechanical Compliance Certificate to correspond to the current activity and to the specified mechanical units (e.g. none of the specified units moves 12,000 CFM or has a 12 BHP motor). Reference: Section C101.4.3, IECC 2012.
2. Complete the Mechanical Compliance Certificate by checking the appropriate line items in Section 4, the Requirements Checklist. Supporting documentation shall be either on the drawings or in the project manual. The project manual shall be sealed per Section R4-30-304 of the Rules of the Board of Technical Registration. Reference: Section C403.2, IECC 2013.
3. Clarify the sensible and total cooling capacities for AC-1. Reference: Section C403.2.2, IECC 2012.
4. Explain the "humidity requirement" noted as a reason to not install economizers. Reference: Section C403.3.1 (2), IECC 2012.
12/30/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Revise detail on sheet A2.4 to show strainers on both the roof drain and the overflow drain. Show where and how the overflow drains are to discharge. Reference: Sections 1102.6 and 1108.2, IPC 2012.
12/30/2013 ROBERT SHERRY WATER REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
01/21/2014 CPIERCE1 REJECT SHELF Completed