Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T13CM06879
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/04/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Sheet T-1.1 still references the 2012 UPC, sheet P-1.1 now notes gas pipe sizes were determined by "UPC Table 12-8 of the 2012 IPC" (the IPC does not have any gas piping tables - see the 2012 International Fuel Gas Code). Note 3 of the Fixture Connection Schedule on sheet P6.1 still refers to the 2010 California Green Building Code for allowable fixture flow rates. [Second comment: Comment not resolved. Sheet T-1.1 references the 2012 UPC, sheet P-1.1 notes the 2012 IPC, and sheet P-4.2 references the 2010 California Green Building Code and the California Fuel Code.][Initial comment: The International Plumbing Code, 2012, is the controlling code for this activity, not the 2006 International Plumbing Code (similarly, the California Plumbing Code is not acceptable). The use of the 2012 Uniform Plumbing Code is allowed provided an appeal to the building official is filed. There is no charge for this appeal. This review has been made using the 2012 IPC. Reference: Section 101, IBC 2012.] 2. Comment not resolved. Sheet P1.1 still shows a flat vent for a floor drain (P10) in the kitchen and a note allowing flat vents provided drainage fittings are used and a wall cleanout is added to the vent riser. On sheet P5.1, the same floor drain is shown with a vent rising vertically in the middle on the kitchen. [Second comment: Flat venting is not allowed inside buildings under the IPC but it is shown in five locations on sheets P1.1 and P5.1 and a note on sheet P1.1.] [Initial comment: Verify that all of the vents (except for vents serving interceptors located outdoors; i.e. flat venting is not allowed inside buildings under the IPC) rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2012.] |
| 03/04/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | AC-2, AC-3, and AC-4 are still shown with ¾" condensate drains; Lennox typically has a 1" minimum drain pan connection. Condensate drains may not decrease in size from the drain pan connection to the termination point. [Second comment: On sheet P-4.1, AC-2, AC-3, and AC-4 are still shown with ¾" condensate drains. Keynote 8 on sheet P-1.1 still indicates that a 1-1/4" condensate drain is to be reduced to 1" in the drop to the floor sink.] [Initial comment: Verify the size of the drain pan condensate connections for the specified air conditioning units; Lennox typically has a 1" minimum drain pan connection. See also keynote 8 on sheet P-1.1; it shows the 1-1/4" condensate drain on the roof reducing to 1" in the drop to the floor sink. Condensate drains may not decrease in size in the direction of flow. Reference: Section 307.2.2, IMC 2012.] |
| 03/06/2014 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Chick Fil A @ Tanque Verde & Grant. T13CM06879 Building Plan (3rd Review) TRANSMITTAL DATE: March 6, 2014 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. The development package (DP) sheets provide within this building set are not the approved DP sheets. Either provide the approved sheets with you next submittal or remove the DP sheets from the building plan set. 3. Zoning has reviewed the building plans and they appear to meet the requirements of DP13-0083 but due to the number of comments by other PDSD review sections Zoning will not approve the building plans at this time. Once all other PDSD review sections have approved the building plans Zoning will approve. 4. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 03/07/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/03/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
| 04/03/2014 | SHANAE POWELL | REJECT SHELF | Completed |