Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM06877
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/13/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
11/13/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
11/13/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Passed | |
11/13/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/13/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A.2; ROOF PLAN: KEYNOTES 6, 9, AND 10 WERE NOT LOCATED ON THE PLAN. VERIFY. 2. SHEET A.2; ROOF PLAN: KEYNOTE 17 LOCATED IN THE SOUTHWEST CORNER OF THE PLAN IS NOT IN THE KEYNOTES. PROVIDE. 3. SHEET A.3; ELEVATIONS: KEYNOTE 11 WAS NOT LOCATED ON THE ELEVATIONS. VERIFY. 4. SHEET S.2 (FRAMING PLAN); STRUCTURAL CALCULATIONS (SHEET 4): BEAM B-2 IN THE CALCULATIONS AT THE NORTHWEST CORNER OF THE PLAN IS SHOWN AS A 5 1/8" X 12" GLB, WHILE SHEET S.2 INDICATES KEYNOTE 1 (STEEL TUBE BEAM). CLARIFY. 5. SHEET S.2; STEEL FRAMING LAYOUT: INDICATE THE TYPICAL TUBE SIZE ON THIS PLAN. 6. SHEET S.3 (DETAIL 1); STRUCTURAL CALCULATIONS (SHEET 9): THE CALCULATIONS INDICATE A BRACE SIZE OF A 4X4X1/4 ANGLE, WHILE THE DRAWING INDICATES A 3 1/2 X 3 1/2 X 1/4 ANGLE. CLARIFY. 7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
11/13/2013 | RSHERRY1 | WWM | REVIEW | Passed | No wastewater plumbing. |
11/13/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide roof drainage calculations and plans; include the effect of any vertical walls that can divert rainfall onto the roof. Show how overflow protection is provided for the roof. Reference: Sections 1101, 1106 and 1108, IPC 2012. |
11/13/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/15/2013 | SPOWELL1 | ENGINEERING | REVIEW | Needs Review | |
11/15/2013 | SPOWELL1 | ZONING | REVIEW | Needs Review |