Permit Number: T13CM06836
Parcel: 10922022B

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/WWM

Permit Number - T13CM06836
Review Name: RESIDENTIAL - BLDG/WWM
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/13/2013 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T13CM06836
PLAN REVIEW COMMENTS
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken.

SCOPE OF REVIEW:
The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2012 International Residential Code, 2012 International Fire Code, 2011 National Electrical Code and Arizona Revised Statutes. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL REQUIREMENTS:
All corrections and revisions shall be made on original tracings or a finished reproducible set. Return two sets along with a set of the first submission for reference. Pen or pencil corrections on final prints will not be acceptable. To avoid delays, ensure that all corrections have been made, are complete, and have been coordinated on all applicable detail and note sheets. (Do not cloud the changes made for comment revisions). Incorporate changes on originals and provide two copied sets for review.

All engineers and architects involved in the design of the structure are to seal the related sheets of plans, details and calculations in accordance with the rules of the State Board of Technical Registration.
DIAGRAMS
1. Provide permanent line side tap lug connectors rather than Polaris lugs (per TEP fault-protection agreement).

If you have any questions please contact:
Ken Van Karsen
(520) 837-4912
City of Tucson Residential Plan Review
11/15/2013 JASON GREEN ENGINEERING REVIEW Denied DATE: November 18, 2013
SUBJECT: 3170 N Craycroft Rd- Ground Mount Photovoltaic System Installation
TO: Jim West
REVIEWERS: Jason Green, CFM
ACTIVITY: T13CM06836 (Building Plan) and T13OT01331 (Floodplain Use Permit)

SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the Building Plan (T13CM06836) and Floodplain Use Permit (T13OT01331) for the above referenced property and does not recommend approval of the at this time.

The subject property is entirely located within a Special Flood Hazard Area (SFHA), Zone AE as shown on the Flood Insurance Rate Map (FIRM), Community- Panel No. 040073-04019C-1713L, effective date June 16, 2011.

Per Section 26-5.2 of the Tucson Code no development, storage of materials or equipment or other uses shall be permitted which acting alone or in combination with existing uses, create a danger or hazard to life or property. In order to process your application for development within the floodway fringe of the Pantano Wash the following information is required:

BUILDING PLAN:

1) TC Sec.26-5.2.3: Provide a note on the building plan to state; "The subject property is affected by the City of Tucson Floodplain Regulations. A Floodplain Use Permit and Elevation Certificate are required prior to building final inspection."

2) TC Sec.26-5.2.11: Revise the building plan and Section A-A detail to show that the bottom of the solar panel and/or the lowest point of all service facilities such as the electrical components or equipment, whichever is lower, is at or above the regulatory flood elevation (2443 feet NAVD 1988). Provide the elevation in place of the referenced "18 1/8 inch dimension." The calculated base flood elevation for the proposed use was established at 2442 feet NAVD per the Flood Insurance Study prepared for the Pantano Wash.

3) TC Sec.26-11.2.h: An Elevation Certificate (FEMA Form 086-0-33) must be prepared by a state registered land surveyor and submitted to our office prior to Final Electrical and Building Final inspections. The ELCERT will be issued with the Building Permit with all applicable Community Information filled out.

GENERAL COMMENTS:

Please provide a revised Building Plan with revised details that addresses the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments.

For any questions or to schedule meetings call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services

Final Status

Task End Date Reviewer's Name Type of Review Description
11/18/2013 CPIERCE1 REJECT SHELF Completed