Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM06788
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/14/2013 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Cope Behavioral Health Services - 8050 E. Lakeside Pkwy. T13CM06788 Building Plan (1st Review) TRANSMITTAL DATE: November 14, 2013 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 3. Until the development package has been approved the building plans cannot be approved. 4. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
11/18/2013 | JASON GREEN | ENGINEERING | REVIEW | Reqs Change | Will review the building plan after approval of the DP Package, DP13-0222. |
11/20/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
11/25/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. Several mechanical and electrical drawings have non-compliant lettering sizes below our required standard of 3/32" minimun, actual size, both upper and lower case. a. Please revise all drawings that have non-compliant lettering sizes and resubmit. 2. Clearify the type of water dispenser located in the waiting room and show location of cups mounted on the wall in a large scale elevation. a. The plumbing drawings do not call out this water dispenser as a "Point of Use" dispenser which it must be to meet accessibility requiremnts. END OF REVIEW |
11/25/2013 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
12/04/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
12/04/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/04/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved |