Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM06736
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/05/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 11/05/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide heating and cooling load calculations to justify the size of the new heat pump. 2. Revise the capacity of the exhaust fan for the men's restroom - 50 CFM per water closet or urinal. 3. Verify that the total airflow for HP-2 complies with the manufacturer's listing instructions. Coordinate the airflow with the mechanical plan. 4. Correct the area of the computer room in the ventilation calculations. Coordinate the balancing data for HP-2 in the ventilation calculations and in the equipment schedule. |
| 11/05/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 11/05/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 11/05/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 11/05/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 11/05/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide tempering valves listed to comply with ASSE 1070 for the lavatories.Limit the hot water temperature to 110 degrees Fahrenheit. 2. Install the vacuum relief valve for the water heater per the manufacturer's instructions (i.e. no valves between the relief valve and the water heater). |
| 11/05/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
| 11/05/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 11/08/2013 | FRODRIG2 | WWM | REVIEW | Completed |